Skip to main content

Work begins on major southern Vietnam bridge

Construction has begun on two-kilometre bridge spanning the Tien River in the Mekong Delta in southern Vietnam. The investment of US$145 million is funded by non-refundable aid from the Australian government, a loan from the Asia Development Bank and Vietnamese government capital. The cable-stayed Cao Lanh Bridge, which links Cao Lanh Town and Lap Vo District in Dong Thap Province, will have four lanes for motorised vehicles to run at a speed of 80 kilometres per hour and two other lanes for non-motoris
October 25, 2013 Read time: 2 mins
Construction has begun on two-kilometre bridge spanning the Tien River in the Mekong 33 Delta in southern Vietnam.  The investment of US$145 million is funded by non-refundable aid from the Australian government, a loan from the 6849 Asia development Bank and Vietnamese government capital.

The cable-stayed Cao Lanh Bridge, which links Cao Lanh Town and Lap Vo District in Dong Thap Province, will have four lanes for motorised vehicles to run at a speed of 80 kilometres per hour and two other lanes for non-motorised vehicles.  Once completed in 2017, the bridge is expected to be used by 170,000 people a day.

The Cao Lanh Bridge is the single largest Australian aid activity on mainland Southeast Asia. It is one of three infrastructure projects that make up the broader Central Mekong Delta Connectivity Project, comprising two high cable-stayed bridges with a combined length of five kilometres and an additional 25 kilometres of connecting roads.

“The Cao Lanh Bridge will directly benefit the lives of five million Vietnamese in the Delta by stimulating private sector investment and local industry, boosting Vietnam’s exports, and improving access to social and health services,” Senator Brett Mason, Australia's Parliamentary Secretary to the Minister for Foreign Affairs, said at the groundbreaking ceremony.

Related Content

  • Pedestrian counters help monitor the effectiveness of new investment
    December 16, 2016
    Eton Community Association has commissioned the charity, the Outdoor Trust, to develop a promotional Walkway for the town in Berkshire in the UK. In advance of the launch in spring 2017 two Eco Pyro pedestrian counters, supplied by UK company Traffic Technology, have been installed in the town to study footfall along the High Street. Results indicate that on most days people are using the bridge as the main gateway to the town but that only 60 per cent of people crossing the bridge travel the distance o
  • Construction begins on I-11 connecting Las Vegas and Phoenix
    April 10, 2015
    Construction has begun on Interstate 11 (I-11), from I-515 to US 93, a 15-mile landmark project that will support Nevada’s continued economic prosperity through enhanced commerce, increased tourism and improved connectivity between Nevada and Arizona as well as beyond to Canada and Mexico. Designated by the federal government as the future highway, I-11 will connect Las Vegas and Phoenix, the only two cities in the nation with populations of more than one million residents not currently linked by an inte
  • Government support for Australian infrastructure projects
    April 12, 2016
    The Australian Government has announced plans to invest in Australia’s infrastructure, spending US$370.27 million (AU$490 million) in Western Australia infrastructure in 2016-2017 and US$1.2 billion (AU$1.5 billion) on road and rail projects in Victoria. Prime Minister Malcolm Turnbull stated that the federal government and the Western Australia state government will work together to identify the appropriate projects for the additional investment. A spokeswoman for West Australian Premier Colin Barnett,
  • Melbourne metro funding fast-tracked
    February 16, 2015
    Work has begun on one of Australia’s largest infrastructure projects: two nine-kilometre underground rail tunnels that will transform Melbourne’s public transport system. The Victoria government has fast-tracked US$31 million to establish the Melbourne Metro Rail Authority and start work on the project as soon as possible. The project also includes five new underground stations. The Authority will oversee immediate planning works, complete development of the reference design and undertake detailed site inve