Skip to main content

TagMaster wins order from Bombardier for São Paulo Line 5 Project

Sweden-headquartered TagMaster has received an order from Bombardier Transportation to provide its advanced RFID solution for a project to upgrade and extend the signalling on Line 5 on the São Paulo Metro in Brazil. Bombardier has placed an initial order for Heavy-duty (HD) readers and ID-tags which will be delivered over a 12 month period beginning in August 2012. Additional orders for TagMaster’s Heavy-duty ID-Tags and system spare parts for the project are anticipated during 2013.
July 25, 2012 Read time: 2 mins
RSSSweden-headquartered 177 TagMaster has received an order from 513 Bombardier Transportation to provide its advanced RFID solution for a project to upgrade and extend the signalling on Line 5 on the São Paulo Metro in Brazil. Bombardier has placed an initial order for Heavy-duty (HD) readers and ID-tags which will be delivered over a 12 month period beginning in August 2012. Additional orders for TagMaster’s Heavy-duty ID-Tags and system spare parts for the project are anticipated during 2013.

Bombardier’s scope for this project in São Paulo comprises the turnkey design, supply, installation and commissioning of its Cityflo 650 communications-based train control (CBTC) solution for the existing 8.4 km of line with six stations plus the extension of the line by 11.6 km with 11 new stations and a total of 34 trains. The TagMaster RFID Readers will be installed under the trains and provide both primary train location information and accurate positioning information to the Cityflo 650 CBTC train control system. This driverless system will enable trains to circulate in safety with a short, 75-second, headway, therefore maximising the line capacity. The system will also use TagMaster’s field programmable version of the HD Tag, which will enable the Bombardier installation team to programme individual tag location information in the tag to suit the actual mounting position.

For more information on companies in this article

Related Content

  • Thales record Korea deployment
    May 29, 2012
    Thales has delivered European Train Control System (ETCS) Level 1 systems for the Gyeongchun Line, a 81 km rail link in the north-east of Seoul, in South Korea, and the 89 km Jeolla Line serving Yeosu in the south of the country, host city for Expo 2012. The ITX (Intercity Train eXpress) Gyeongchun high-speed train service began operating in February after project completion to a tight schedule of just 18 months. Based on the quality of the systems and the work performed, the customer also selected Thales
  • Public transport operators implement passenger safety systems
    December 4, 2012
    Operators of public transport systems are arming themselves with sophisticated systems of technology to ward off terrorism threats to passenger safety. David Crawford reports. City transportation authorities worldwide are looking more keenly than ever for mass transit solutions to overcome traffic congestion and manage commuter flows. As they do so, concerns over passenger security are driving development of new technologies for terrorist incident detection, response and emergency passenger evacuation. The
  • Jenoptik wins large traffic monitoring order in Saudi Arabia
    May 16, 2012
    Jenoptik's traffic solutions division has received a major order for systems and equipment for traffic monitoring from the Kingdom of Saudi Arabia. The customer is Dallah Trans Arabia, located in Jeddah, and the scope of supply includes several hundred stationary systems for monitoring red light and speed violations. About 100 systems for mobile and stationary speed monitoring as well as a comprehensive software solution of Jenoptik have already been in use in Saudi Arabia since last year. The total equipme
  • Re-timing traffic signals delivers cost benefits
    June 28, 2012
    Nashville's signal optimisation programme produced a stunning return on investment. Are those results exceptional? Could similar results be replicated in cities across the US and indeed the world? ITS International spoke to Chris Rhodes, P.E. of Kimley-Horn and Associates, project leader for the Nashville signal optimisation programme. "You have to bear in mind that with signal optimisation programmes you don't see, for instance, physical construction or new pieces of equipment on the roadside that someone