Skip to main content

PB designing fibre network for MDOT

The Michigan Department of Transportation (MDOT) has awarded a contract to Parsons Brinckerhoff (PB) for the design of a new fibre-optic communications network in metropolitan Detroit. The project is a multi-phase effort to build an MDOT-owned fibre-optic network for communications with the Detroit region’s intelligent transportation system deployment, including hundreds of closed-circuit television cameras, dynamic message signs and vehicle detection systems along regional freeways.
April 19, 2012 Read time: 2 mins
RSSThe 1688 Michigan Department of Transportation (MDOT) has awarded a contract to 4983 Parsons Brinckerhoff (PB) for the design of a new fibre-optic communications network in metropolitan Detroit. The project is a multi-phase effort to build an MDOT-owned fibre-optic network for communications with the Detroit region’s intelligent transportation system deployment, including hundreds of closed-circuit television cameras, dynamic message signs and vehicle detection systems along regional freeways. The system will link all of the existing network hubs and nodes, eliminating the need for existing leased communications services, and upgrading the existing wireless radio communications to high-bandwidth fibre-optic links for most of the field devices and remote network nodes. The project encompasses the full extent of the Detroit-area freeway system, including over 160kms of instrumented roadway.

As the prime consultant, PB is responsible for the overall design of the communications network. Its services will entail preparation of a design report and network migration plan, with recommendations for how to best phase roll-out of the system; development of conduit installation plans for dozens of miles of regional freeways; and design of fibre-optic plans, including cable routing, network sizing, splice points, and fibre allocation details.  The design will include a minimum of two phases, with the first phase focusing on elimination of an existing leased fibre-optic service, and the second phase focusing on network redundancy and reduction of wireless linkages.

Construction of Phase 1 will commence in July 2013, with completion slated for late 2014.

For more information on companies in this article

Related Content

  • Platooning with Ease on the I-70
    July 15, 2025
    What would happen to truck platooning - a nascent technology - if the weather turns nasty? The I-70 Truck Automation Corridor Project in the northern US should provide some answers, reports David Arminas…
  • SmartMobility for Bay of Cadiz
    January 30, 2012
    Telvent's SmartMobility Light Rail Solution will be deployed for the new metropolitan light rail system in Spain's Bay of Cadiz. The new light rail system, which will have a total of 22 stations along its 24km route, is expected to go into operation by 2011.
  • Telematics standards need to evolve to keep up with technology
    July 30, 2012
    Scott Andrews and Scott McCormick take a look at how standards development for the telematics environment needs itself to evolve in order to stay abreast of technological advances. While the road has been somewhat arduous, telematics has evolved from a research activity to a resource for fleet operators, consumers and road management authorities.
  • Magna Partners with Michigan DOT and 3M on vehicle connectivity
    July 11, 2017
    US automotive supplier Magna is lending its camera and secure connectivity expertise to a joint project with the Michigan Department of Transportation (MDOT) and 3M.