Skip to main content

PB designing fibre network for MDOT

The Michigan Department of Transportation (MDOT) has awarded a contract to Parsons Brinckerhoff (PB) for the design of a new fibre-optic communications network in metropolitan Detroit. The project is a multi-phase effort to build an MDOT-owned fibre-optic network for communications with the Detroit region’s intelligent transportation system deployment, including hundreds of closed-circuit television cameras, dynamic message signs and vehicle detection systems along regional freeways.
April 19, 2012 Read time: 2 mins
RSSThe 1688 Michigan Department of Transportation (MDOT) has awarded a contract to 4983 Parsons Brinckerhoff (PB) for the design of a new fibre-optic communications network in metropolitan Detroit. The project is a multi-phase effort to build an MDOT-owned fibre-optic network for communications with the Detroit region’s intelligent transportation system deployment, including hundreds of closed-circuit television cameras, dynamic message signs and vehicle detection systems along regional freeways. The system will link all of the existing network hubs and nodes, eliminating the need for existing leased communications services, and upgrading the existing wireless radio communications to high-bandwidth fibre-optic links for most of the field devices and remote network nodes. The project encompasses the full extent of the Detroit-area freeway system, including over 160kms of instrumented roadway.

As the prime consultant, PB is responsible for the overall design of the communications network. Its services will entail preparation of a design report and network migration plan, with recommendations for how to best phase roll-out of the system; development of conduit installation plans for dozens of miles of regional freeways; and design of fibre-optic plans, including cable routing, network sizing, splice points, and fibre allocation details.  The design will include a minimum of two phases, with the first phase focusing on elimination of an existing leased fibre-optic service, and the second phase focusing on network redundancy and reduction of wireless linkages.

Construction of Phase 1 will commence in July 2013, with completion slated for late 2014.

For more information on companies in this article

Related Content

  • Thales to upgrade Greater Cairo Metro
    December 18, 2015
    More than 30 years after winning its first contract for the Greater Cairo Metro, Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3). Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment
  • Re-timing traffic signals delivers cost benefits
    June 28, 2012
    Nashville's signal optimisation programme produced a stunning return on investment. Are those results exceptional? Could similar results be replicated in cities across the US and indeed the world? ITS International spoke to Chris Rhodes, P.E. of Kimley-Horn and Associates, project leader for the Nashville signal optimisation programme. "You have to bear in mind that with signal optimisation programmes you don't see, for instance, physical construction or new pieces of equipment on the roadside that someone
  • With C-ITS we can get ourselves connected
    June 27, 2025
    Workzones need to be safer for drivers and workers – and the technology exists to harmonise safety with mobility needs, says Swarco’s Daniel Lenczowski
  • Kistler unveils KiRoad Wireless HDR
    June 30, 2021
    Solution features remote wireless transmission for wheel force measurements