Skip to main content

High speed surfing in France and Italy

Two announcements on the same day – from the OCEA Consortium and from Andrew Solutions - have reported overcoming the challenges of internet access in high-speed trains travelling at over 200mph (320km/h) in France and Italy. The technological achievements realised by the consortium have risen to the challenge of ensuring service at high speed in a high voltage electrical environment, and integrating the system's maintenance into the overall maintenance schedules of a high-speed network with no impact on th
May 18, 2012 Read time: 2 mins
Two announcements on the same day – from the OCEA Consortium and from Andrew Solutions - have reported overcoming the challenges of internet access in high-speed trains travelling at over 200mph (320km/h) in France and Italy.

The technological achievements realised by the consortium have risen to the challenge of ensuring service at high speed in a high voltage electrical environment, and integrating the system's maintenance into the overall maintenance schedules of a high-speed network with no impact on the rotation of trains.

"Providing Internet connectivity at 320 km/h was a new challenge that we are all proud to have successfully addressed for the SNCF," commented Philippe Roger of 5636 Orange Business Services.
Meanwhile, 1983 Telecom Italia called on Andrew Solutions’ 950 CommScope division to provide its equipment, commissioning services, and expertise in support of 2G and 3G wireless networks on 5637 Trenitalia Frecciarossa high speed trains. The Frecciarossa high speed train line is the fastest in Trenitalia’s fleet, with speeds reaching between 300-350 kilometers per hour.

As part of the new coverage and capacity project led by Telecom Italia, Andrew’s in-train solution is extending reliable wireless signals to passengers and staff on all 60 Frecciarossa trains. High speed trains’ metalised windows can dramatically reduce signal penetration into the carriages, resulting in spotty coverage and an increase of dropped calls. The pure speed of high speed trains complicates the hand off of wireless signals between base stations. And the complexities of different terrain and rapidly changing outdoor signal levels of the various networks involved increase the complexity.

Andrew’s wireless coverage solution is helping produce elongated cells that reduce the number of handovers required while boosting signal strength within the handover region. The company supplied about 600 Node AM dual band digital repeaters and kilometres of Radiax radiating cable with connectors and accessories, in addition to helping design and commission the wireless coverage system. An Andrew Node AM repeater, pickup antenna for GSM 900 MHz/UMTS 2100 MHz/GPS frequency bands, and metres of Radiax are installed in each Frecciarossa train carriage.

For more information on companies in this article

Related Content

  • Manchester seeks smart but not selective transport solutions
    January 25, 2018
    Smarter transport relies on better communications both with travellers and between transport providers. Andrew Williams reports. Inrix’s prediction that the cost of traffic congestion will rise by 63% to £21bn per year by 2030 clearly illustrates that, in addition to the ongoing inconvenience and inefficiency, ongoing gridlock is a significant drain on the economy. It is against this backdrop that a Cisco-led consortium has launched CitySpire, a smart transport programme that uses location-based services a
  • Trials show fuel savings with connected vehicle technology
    December 16, 2015
    American and European trials point to fuel and emissions reductions. A trial by University of California-Riverside (UC-Riverside) has shown connected vehicle technology has the potential to reduce fuel consumption (and therefore emissions) by up to 18% compared with an uninformed driver.
  • Verra Mobility tolling payment for Sixt in Italy
    July 22, 2025
    Rental drivers will be able to opt-in to electronic tolling on country's network
  • Dubai metro - the world's longest automated rail system
    July 31, 2012
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.