Skip to main content

Work starts on more UK smart motorways

Three new major motorway schemes on the M1 and M3 will cut congestion and give Britain's drivers smoother, quicker journeys, Transport Secretary Patrick McLoughlin has announced. Construction will now start on the M1 junctions 28-31 in Derbyshire, M1 junctions 32-35a in South Yorkshire and on the M3 at junction 2-4a in Surrey. The new schemes are central to the Government's long term economic plan and part of US$41 billion of investment in the road network by 2021, which will see spending tripled to U
July 9, 2014 Read time: 3 mins
Three new major motorway schemes on the M1 and M3 will cut congestion and give Britain's drivers smoother, quicker journeys, Transport Secretary Patrick McLoughlin has announced.

Construction will now start on the M1 junctions 28-31 in Derbyshire, M1 junctions 32-35a in South Yorkshire and on the M3 at junction 2-4a in Surrey.

The new schemes are central to the Government's long term economic plan and part of US$41 billion of investment in the road network by 2021, which will see spending tripled to US$5 billion each year on England's key highways and motorways.

Smart motorways convert the hard shoulder to a running lane to boost capacity and smooth traffic, operating either permanently or during busy periods. Overhead variable message signs inform motorists of changes in speed limits, queuing and lane closures, while staff in regional control centres use CCTV to monitor incidents.

These schemes will boost capacity by a third and improve journey times up to 10 per cent through the M1 schemes and 15 per cent on the M3, where average speeds are currently 45mph during rush-hour. The national speed limit on these sections will remain at 70 mph.

The 503 Highways Agency previously consulted on proposals to limit speeds to 60mph between 7am and 7pm seven days a week because of the potential effect of the new schemes on local air quality.

However, the Transport Secretary has rejected this approach as the Government's preferred option for managing the problem and has instead asked the Highways Agency to rigorously investigate alternatives as work progresses on the schemes in the next 12-18 months. If any proposals continue to include varying speed limits, they must only apply when absolutely necessary. In particular, the Agency must look for alternatives that maintain the 70mph limit wherever possible, particularly when traffic tends to be lighter, such as at weekends and outside of peak commuting hours.

In the meantime, as with all smart motorways already in successful operation, the Highways Agency will take the necessary legal powers to enable them to vary the speed limit from the routine 70mph at certain times.

McLoughlin said: "Let me be absolutely clear, I want all motorways to run at 70mph. While it sometimes makes sense to use variable limits to keep people moving, blanket reductions are not acceptable. Smart motorways are an effective and cost efficient way of increasing space on our roads, cutting jams and speeding up journey times and I am pleased to announce the start of work on these schemes."

For more information on companies in this article

Related Content

  • Cross border enforcement a logical step
    January 30, 2012
    The logic supporting a cross-border enforcement Directive for the European Union (EU) is both detailed and compelling. The White Paper on European transport policy published in 2001 included the ambitious objective of reducing by 50 per cent by 2010 the number of people killed on the roads of the EU. But since 2005 the reduction in the number of road deaths has been slowing down: overall, the period from 2001 until 2009 saw the number of fatalities decrease by 36 per cent. According to Community indicators,
  • Utah Department of Transportation: How we’re using traffic analytics software
    February 4, 2025
    Our use of Iteris ClearGuide lets our traffic operations engineers interpret critical probe traffic data without the need for statisticians and software developers
  • WIM system certification is a complex business
    February 21, 2018
    There are interesting moves afoot to create Germany’s first Weigh-In-Motion enforcement site in Hamburg – but Florian Weiss of Traffic Data Systems warns that WIM certification is a complex business. In the past, Weigh-In-Motion (WIM) was mainly used for statistical (WIM-S) and pre-selection (WIM-P) applications. These abbreviations - as well as WIM-E (enforcement) and WIM-T (tolling) - were created by Traffic Data Systems during Intertraffic 2006 in Amsterdam. This was also the year when we started the
  • Variable speed limits to warn of adverse weather on British Columbia highways
    December 3, 2015
    Variable speed signs are being installed on sections of the Coquihalla, Trans-Canada and Sea to Sky highways in Canada, as part of a US$9.4 million pilot project to help reduce the frequency of weather-related crashes.