Skip to main content

South west’s first smart motorway opens

The first smart motorway scheme in the UK’s south west has been officially launched, covering seven miles of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5. It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods. The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and
January 15, 2014 Read time: 2 mins
The first smart motorway scheme in the UK’s south west has been officially launched, covering seven miles of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5.  It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods.

The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and smooth the flow of traffic. During busy periods, traffic officers in the regional control centre at Avonmouth will set overhead message signs to inform drivers they can use the hard shoulder as an extra lane and at what speed to drive.

The project included installation of 33 new gantries, refurbishing seven existing ones, resurfacing over 14 miles of carriageway, laying over 30 miles of fibre optic cabling and constructing six emergency refuge areas.

Launching the scheme, Roads Minister Robert Goodwill said: “Every day, more than 140,000 vehicles use this section of motorway which is an essential gateway to the South West. That is why the government has invested almost US$148 million to help improve access and traffic flow on this vital route. This is the first smart motorway in the region and I’m delighted that road users and businesses will be able to benefit from the improvements earlier than planned.”

503 Highways Agency senior project manager Paul Unwin said: “The M4 and M5 scheme demonstrates how a smart and efficient solution can deliver improvements that road users need – more capacity and better management of traffic to reduce congestion and make journey times more reliable.”

For more information on companies in this article

Related Content

  • Singapore aims to set MaaS benchmark
    September 26, 2019
    Delegates at this year’s ITS World Congress in Singapore will be able to experience Mobility as a Service for themselves in the form of MobilityX’s Zipster app
  • Virtual modelling shows driverless cars could cut delays in the future
    January 9, 2017
    Driverless cars could significantly reduce delays according to a new study by the Department for Transport (DfT). The project used computer software to create virtual models of different parts of the UK road network including urban roads and a 20km motorway section. Delays and traffic flow were all shown to improve as the proportion of automated vehicles increased above specific levels.
  • TfL cycle superhighways plans will still disrupt traffic, says FTA
    January 28, 2015
    The Mayor of London, Boris Johnson, has set out final plans for the construction of Europe’s longest substantially-segregated urban cycleways, the centrepiece of his US$1.3 billion commitment to get more Londoners on their bikes. Subject to approval by Transport for London, construction of the routes will begin in March. Two continuous cycle routes, almost completely separated from traffic, will cross central London from east to west and north to south, opening up thousands of new journey opportunit
  • Highways Agency publishes 2013 ROI report
    January 16, 2014
    Between 2002 and 2012 over US$5.7 billion was invested on substantial capital investment projects to improve the strategic road network in the UK. The Highways Agency has now published its 2013 Post Opening Project Evaluation (POPE) Meta report is now available on the Agency website, which it says represents the most comprehensive evaluation programme of expenditure within UK transport. Detailed appraisals of individual schemes are also carried out before they are put forward for construction. The broa