Skip to main content

Smarter motorway for West Yorkshire

Drivers on the M1 near Wakefield will benefit from reduced congestion and improved journey times after the final phase of a new US$172 million smart motorway went live. The Highways England scheme along a seven-mile stretch of motorway between junction 39 and junction 42 is the first all lane running motorway in the north, where the hard shoulder has been permanently converted to an extra lane. The smart motorway uses the latest technology to monitor traffic levels and variable speed limits on overhea
February 2, 2016 Read time: 2 mins
Drivers on the M1 near Wakefield will benefit from reduced congestion and improved journey times after the final phase of a new US$172 million smart motorway went live.

The 8101 Highways England scheme along a seven-mile stretch of motorway between junction 39 and junction 42 is the first all lane running motorway in the north, where the hard shoulder has been permanently converted to an extra lane.

The smart motorway uses the latest technology to monitor traffic levels and variable speed limits on overhead electronic signs keep vehicles moving, improving the reliability of journeys. The first phase of the scheme was opened in December between junctions 39 and 4.

Infrared CCTV will also be used 24 hours a day to enable staff in the regional control centre near Wakefield to respond quickly to incidents, closing lanes using red Xs on overhead signs if necessary. Drivers will also be able to use emergency refuge areas if they break down.

The smart motorway between junctions 39 and 42 includes: Seven miles of reinforced concrete barriers in the central reservation; Seven miles of resurfacing the equivalent to 46 football pitches; Ten overhead gantries; 38 electronic signs; 6,172 reflective road studs

Work to convert the M1 to a smart motorway between junctions 39 and 42 began in November 2013. Temporary narrow lanes and a 50mph speed limit have been in place to keep three lanes open to traffic in each direction and to create a safe working environment.

The M62 between junction 25 and junction 30 was the first smart motorway in Yorkshire to go live back in 2013. The hard shoulder is used as an extra lane during peak times whereas it has been permanently converted to an extra lane on the new M1 scheme.

For more information on companies in this article

Related Content

  • Road safety award for average speed scheme
    November 28, 2014
    A route enforcement and casualty reduction scheme on the strategic A14 in the UK has won a prestigious Prince Michael International Road Safety Award. The A14 route between the Midlands and East Anglia operates at the national speed limit of 70mph as a dual carriageway with central reserve and no hard shoulder. The average annual daily traffic figure is 74,000 and with no motorways or other high standard diversion routes along this corridor, journeys can be seriously delayed when congestion or collisio
  • No in-road equipment for Queensland's free flow toll bridge
    February 1, 2012
    By May this year, the new Gateway Bridge in Brisbane, which is being built alongside an existing bridge, will be open. With it will come an end-to-end free-flow tolling system. Interview with Sue Caelers, Queensland Motorway Ltd. Queensland Motorways Ltd owns and operates 61km of roadway in the area around Brisbane, Australia. This includes the Gateway Bridge and the Gateway Extension, Logan and Port of Brisbane motorways.
  • RAC survey shows big safety gains with average speed enforcement
    January 11, 2017
    Cheaper and easier communications are providing authorities with new options for influencing driver behaviour. Colin Sowman reports. It’s official; Average speed cameras (ASCs) cut the number of fatal or serious injury crashes by more than a third.
  • UK’s M6 to get VMS to boost safety
    November 18, 2014
    Four of the latest variable message signs (VMS) are to be installed around junction 35 of the M6 motorway at Carnforth, giving drivers better warnings of incidents and other information about the motorway such as weather conditions. As part of the work, new CCTV cameras will be mounted on the VMS signs and standalone masts, allowing Highways Agency traffic officers at the North West Regional Control Centre at Newton-le-Willows to monitor and manage motorway incidents more effectively. A similar, US$2