Skip to main content

Smarter motorway for West Yorkshire

Drivers on the M1 near Wakefield will benefit from reduced congestion and improved journey times after the final phase of a new US$172 million smart motorway went live. The Highways England scheme along a seven-mile stretch of motorway between junction 39 and junction 42 is the first all lane running motorway in the north, where the hard shoulder has been permanently converted to an extra lane. The smart motorway uses the latest technology to monitor traffic levels and variable speed limits on overhea
February 2, 2016 Read time: 2 mins
Drivers on the M1 near Wakefield will benefit from reduced congestion and improved journey times after the final phase of a new US$172 million smart motorway went live.

The 8101 Highways England scheme along a seven-mile stretch of motorway between junction 39 and junction 42 is the first all lane running motorway in the north, where the hard shoulder has been permanently converted to an extra lane.

The smart motorway uses the latest technology to monitor traffic levels and variable speed limits on overhead electronic signs keep vehicles moving, improving the reliability of journeys. The first phase of the scheme was opened in December between junctions 39 and 4.

Infrared CCTV will also be used 24 hours a day to enable staff in the regional control centre near Wakefield to respond quickly to incidents, closing lanes using red Xs on overhead signs if necessary. Drivers will also be able to use emergency refuge areas if they break down.

The smart motorway between junctions 39 and 42 includes: Seven miles of reinforced concrete barriers in the central reservation; Seven miles of resurfacing the equivalent to 46 football pitches; Ten overhead gantries; 38 electronic signs; 6,172 reflective road studs

Work to convert the M1 to a smart motorway between junctions 39 and 42 began in November 2013. Temporary narrow lanes and a 50mph speed limit have been in place to keep three lanes open to traffic in each direction and to create a safe working environment.

The M62 between junction 25 and junction 30 was the first smart motorway in Yorkshire to go live back in 2013. The hard shoulder is used as an extra lane during peak times whereas it has been permanently converted to an extra lane on the new M1 scheme.

For more information on companies in this article

Related Content

  • TRL aids Highways Agency with M2 motorway hole investigation
    February 21, 2014
    The UK’s transport research Laboratory (TRL) provided a rapid response when asked for help as part of the investigation of the recent appearance of a hole in the central reservation of the M2 between junctions 5 near Sittingbourne and 6, near Faversham. The hole that appeared is believed to be a dene hole; an historic man made hole which may have been used to mine for chalk hundreds of years ago. The hole was filled in when the M2 was constructed, but recent wet weather contributed to the destabilisati
  • The importance of going with the flow
    April 6, 2018
    Ensuring worker safety and up-to-date driver information is crucial to ensure that roadworks are not a source of danger and delay. Andrew Williams looks at a scheme on the A14 in Cambridgeshire, UK. In recent years, portable workzone ITS solutions have emerged as important tools in the management of major roadworks and system upgrade projects - and are viewed as an increasingly vital means of ensuring any ongoing traffic flow disruption is kept to a minimum. The technology forms a central component of an
  • Reversible express lanes and open road tolling combat congestion
    March 2, 2012
    Teri England, Diamond Consulting Services, details the construction of construction of a world first - reversible express lanes with cashless multi-lane ORT - on the Tampa Hillsborough Expressway
  • New research finds distracted driving on the rise on I-95
    May 12, 2014
    Transurban-Fluor and AAA Mid-Atlantic have released the second annual report on distracted drivers on I-95 in Northern Virginia, which found that despite major construction, distracted driving is a growing problem on the heavily travelled corridor. The report, part of the Orange Cones, No Phones campaign focused on reducing distracted driving in the 95 Express Lanes construction zone, found that the number of frequent I-95 drivers likely to use their cell phone while driving has increased from 56 percent i