Skip to main content

Smarter motorway for West Yorkshire

Drivers on the M1 near Wakefield will benefit from reduced congestion and improved journey times after the final phase of a new US$172 million smart motorway went live. The Highways England scheme along a seven-mile stretch of motorway between junction 39 and junction 42 is the first all lane running motorway in the north, where the hard shoulder has been permanently converted to an extra lane. The smart motorway uses the latest technology to monitor traffic levels and variable speed limits on overhea
February 2, 2016 Read time: 2 mins
Drivers on the M1 near Wakefield will benefit from reduced congestion and improved journey times after the final phase of a new US$172 million smart motorway went live.

The 8101 Highways England scheme along a seven-mile stretch of motorway between junction 39 and junction 42 is the first all lane running motorway in the north, where the hard shoulder has been permanently converted to an extra lane.

The smart motorway uses the latest technology to monitor traffic levels and variable speed limits on overhead electronic signs keep vehicles moving, improving the reliability of journeys. The first phase of the scheme was opened in December between junctions 39 and 4.

Infrared CCTV will also be used 24 hours a day to enable staff in the regional control centre near Wakefield to respond quickly to incidents, closing lanes using red Xs on overhead signs if necessary. Drivers will also be able to use emergency refuge areas if they break down.

The smart motorway between junctions 39 and 42 includes: Seven miles of reinforced concrete barriers in the central reservation; Seven miles of resurfacing the equivalent to 46 football pitches; Ten overhead gantries; 38 electronic signs; 6,172 reflective road studs

Work to convert the M1 to a smart motorway between junctions 39 and 42 began in November 2013. Temporary narrow lanes and a 50mph speed limit have been in place to keep three lanes open to traffic in each direction and to create a safe working environment.

The M62 between junction 25 and junction 30 was the first smart motorway in Yorkshire to go live back in 2013. The hard shoulder is used as an extra lane during peak times whereas it has been permanently converted to an extra lane on the new M1 scheme.

For more information on companies in this article

Related Content

  • CA Traffic journey time deployed on M1
    June 22, 2012
    UK company CA Traffic has supplied a journey time system, based on its Evo8 ANPR cameras and Evolution software to Costain Carrillion JV as part of the contract to improve the M1 motorway on a 24km section between junctions 10 and 13. The system will provide journey planning information to road users via temporary electronic message signs on the heavily used route that runs from London up to the north of England.
  • Radar effective as detection tool for hard shoulder running
    July 23, 2012
    Navtech Radar's millimetric-wave systems are being researched on the M42 in England to look into how this type of detector can assist in the opening of the hard shoulder as an additional running lane. Here, the company's Stephen Clark talks about the technology being used. In England, the Highways Agency's (the HA, an executive agency of the Department for Transport) Managed Motorways system - formerly called Active Traffic Management - uses electronic signs and signals mounted on gantries to direct drivers
  • Drivers urged: ‘Don’t put road workers lives at risk’
    May 23, 2018
    A road junction in Merseyside, UK, has become a hotspot for life-threatening incidents to construction workers, says Highways England. Contractors have reported 23 incidents in two months where their safety has been put at risk by drivers ignoring overnight closures. Road users have driven into roadworks for the £3m improvement project at Switch Island, where the M57, M58 and three A roads all join. One lorry driver travelled through the construction area without stopping - forcing workers to get out
  • MVIS and Bartco UK partner on smart motorway journey time system
    September 21, 2015
    Mobile Visual Information Systems (MVIS) and Bartco UK have partnered on the creation of a journey time solution (JTS) for Bam Morgan Sindall Joint Venture (BMJV) and Costain, contracted by Highways England. The JTS comprises 157 A and C portable VMS, manufactured in the UK by Bartco UK, along with 50 Vysionics Vector integrated ANPR cameras and MVIS’ Web Studio sign management system. It forms part of a new customer experience pilot project on the M1 corridor, which incorporates smart motorway roadworks