Skip to main content

Indra consortium awarded east-west Algeria highway contract

A consortium led by Codiser and including Indra has been awarded a contract to build facilities and provide equipment to operate a 380 kilometre stretch of the east-west Algerian highway. The contract, awarded by L’Algerienne de Gestion des Autoroutes (AGA), the organisation responsible for managing, operating, maintaining and servicing the Algerian national highway network, covers a stretch that links the cities of Hammam El Bibane and Bou Kadir, via the country's capital Algiers, in the central sectio
June 17, 2014 Read time: 2 mins
A consortium led by Codiser and including 509 Indra has been awarded a contract to build facilities and provide equipment to operate a 380 kilometre stretch of the east-west Algerian highway.

The contract, awarded by L’Algerienne de Gestion des Autoroutes (AGA), the organisation responsible for managing, operating, maintaining and servicing the Algerian national highway network, covers a stretch that links the cities of Hammam El Bibane and Bou Kadir, via the country's capital Algiers, in the central section of the three identified by AGA for the construction of the new 1,216 kilometer highway from the Tunisian border to Morocco.

Indra will be responsible for supplying and implementing technology for the traffic control centre and the toll and remote toll system for 141 lanes. The control centre will feature intelligent traffic systems (ITS), including a video surveillance system via closed circuit television (CCTV), as well as technology to automatically detect incidents, measure traffic levels, run meteorological stations and manage variable message panels.

These ITS systems will support permanent monitoring of highway traffic conditions, incident control and automated alarms to provide faster and more efficient services, as well as offering real-time information to drivers regarding traffic levels, journey times, suggestions and weather data, as well as other benefits.

The contract also includes maintenance of all systems for a three-year period.

According to Indra, this is a pioneering project in Algeria, with the east-west highway being the first in the country to feature latest generation traffic technology that meets the most stringent international safety and quality standards. The technology will help improve road safety and cut journey times, as well as driving down fuel consumption and benefitting the environment.

For more information on companies in this article

Related Content

  • TransCore scoops Montreal ATMS contract
    August 23, 2013
    TransCore, working with its Canadian partner Electromega, has been selected by the City of Montreal to deploy TransCore’s TransSuite advanced traffic management system (ATMS) at the city’s traffic control centre, Centre de Gestion de la Mobilité Urbaine (CGMU). The City of Montreal is the second largest in Canada; it has nineteen boroughs with 845 km of arterial roads, 4200 km of local streets and more than 2,000 traffic signal controllers.
  • Developing an integrated WIM/ANPR enforcement system
    July 31, 2012
    The weigh in motion market remains especially buoyant and technological development continues to reflect this. Although there are major differences in operating philosophies, particularly between developed and developing countries, both the numbers of countries using Weigh In Motion (WIM) technology and the numbers of systems that they deploy are on the increase.
  • Tenders in for Brazil’s highways
    September 17, 2013
    Brazil's national ground transport agency Agência Nacional de Transportes Terrestres (ANTT) has received eight bids for its US$1.34 billion BR-050 federal highway concession between the states of Goiás and Minas Gerais. The thirty-year concession involves the construction of the BR-050 highway, including restoration, maintenance, road widening and other improvements to provide a 437 kilometre highway along the Minas Gerais and São Paulo border, with six toll booths.
  • New Hampshire’s Interstate 93 Hooksett Toll Plaza opens for business
    July 31, 2013
    Nearly 15 million vehicles a year using New Hampshire’s I-93 will enjoy faster travel times, better fuel economy and a safer roadway, following the opening of open road tolling (ORT) at the Hooksett toll plaza. Six traditional toll lanes were removed from the centre of the existing toll plaza to permit installation of an ORT system using Schneider Electric’s SmartMobility tolling solution and remote operations and maintenance system (ROMS).