Skip to main content

Indra consortium awarded east-west Algeria highway contract

A consortium led by Codiser and including Indra has been awarded a contract to build facilities and provide equipment to operate a 380 kilometre stretch of the east-west Algerian highway. The contract, awarded by L’Algerienne de Gestion des Autoroutes (AGA), the organisation responsible for managing, operating, maintaining and servicing the Algerian national highway network, covers a stretch that links the cities of Hammam El Bibane and Bou Kadir, via the country's capital Algiers, in the central sectio
June 17, 2014 Read time: 2 mins
A consortium led by Codiser and including 509 Indra has been awarded a contract to build facilities and provide equipment to operate a 380 kilometre stretch of the east-west Algerian highway.

The contract, awarded by L’Algerienne de Gestion des Autoroutes (AGA), the organisation responsible for managing, operating, maintaining and servicing the Algerian national highway network, covers a stretch that links the cities of Hammam El Bibane and Bou Kadir, via the country's capital Algiers, in the central section of the three identified by AGA for the construction of the new 1,216 kilometer highway from the Tunisian border to Morocco.

Indra will be responsible for supplying and implementing technology for the traffic control centre and the toll and remote toll system for 141 lanes. The control centre will feature intelligent traffic systems (ITS), including a video surveillance system via closed circuit television (CCTV), as well as technology to automatically detect incidents, measure traffic levels, run meteorological stations and manage variable message panels.

These ITS systems will support permanent monitoring of highway traffic conditions, incident control and automated alarms to provide faster and more efficient services, as well as offering real-time information to drivers regarding traffic levels, journey times, suggestions and weather data, as well as other benefits.

The contract also includes maintenance of all systems for a three-year period.

According to Indra, this is a pioneering project in Algeria, with the east-west highway being the first in the country to feature latest generation traffic technology that meets the most stringent international safety and quality standards. The technology will help improve road safety and cut journey times, as well as driving down fuel consumption and benefitting the environment.

For more information on companies in this article

Related Content

  • Vital Technology data comms network deployed at Dublin Port Tunnel
    July 13, 2012
    Vital Technology has supplied a data communications network system to Egis Road & Tunnel Operation Ireland (ERTO) for the Dublin Port Tunnel which opened to traffic in 2007 and is the longest urban tunnel in Europe as well as the largest civil engineering project ever undertaken in Ireland. While core components are proving durable, communication systems became subject to early obsolescence and were causing networking problems and unscheduled closures which prompted the upgrade.
  • NSW commits major funds to roads and maritime in 2013-2014 state budget
    June 20, 2013
    The New South Wales (NSW) Government will invest US$4.7 billion to build and maintain critical road and maritime infrastructure across the state in the 2013-2014 state budget, providing for new roads infrastructure, maintenance and road safety. Roads minister Duncan Gay says this new infrastructure fund, Restart NSW, will support the WestConnex Motorway, WestConnex enabling works in the Port Botany and Sydney Airport Precinct, the Pacific and Princes highways, Bridges for the Bush, and addressing congestion
  • Lighting upgrade completed on UK motorway
    May 18, 2017
    UK civil and electrical engineering firm, McCann, has completed the lighting upgrades on a 19km stretch of the M62 motorway between J22-25, replacing 1,224 existing high pressure sodium lanterns with new Ampera Maxi LED lighting units. The project, coordinated by Highways England’s term contractor A-one+, also included the installation of a new central management system, with remote manipulation of operational burn hours, control over the timing of dimmed lighting when there is minimal traffic and fault mon
  • Moxa equips Taiwan's Hsuehshan Tunnel with Ethernet for emergency traffic control system
    August 30, 2012
    Moxa has equipped Taiwan’s Hsuehshan Tunnel with its NPort 5230 device servers and EDS-508A-SS-SC Ethernet switches as part of the tunnel emergency traffic control system. The tunnel is south east Asia's second longest road tunnel and comprises three independent tunnels (one pilot tunnel, one West-bound tunnel, and one east-bound tunnel) stretching 12.9 kilometers through Hsuehshan Mountain, the second highest mountain in East Asia.