Skip to main content

'190,000 trips' on day 1 of Sydney Metro extension

15.5km extension means 2,645 new metro services will travel through city each week
By Adam Hill August 20, 2024 Read time: 2 mins
Lucky people (image: NSW Government | Sydney Metro)

More than 190,000 trips were made on the first day (19 August) of the Sydney Metro extension, according to NSW Government.

The new driverless service in the Australian city extends from the north-west, under the famous harbour for the first time, and through the Sydney central business district, with six brand-new underground stations - Crows Nest, Victoria Cross, Barangaroo, Martin Place, Gadigal and Waterloo - and new metro platforms at Central and Sydenham stations.  

The 15.5km extension is the latest stage of the M1 Northwest & Bankstown Line, which has stops at 21 stations between Tallawong and Sydenham. The remaining 13km of the M1 Line will open after the conversion of 10 existing stations on the T3 Bankstown Line.

Around 30 services per hour run at peak times, with capacity to move more people across Sydney Harbour in the busiest hour than the Sydney Harbour Bridge and Sydney Harbour Tunnel combined.

It means 2,645 new metro services will travel through the heart of the city each week, moving 17,000 people each way per hour in the morning rush hour.

A train runs every four minutes in the peak, seven minutes during weekdays between morning and afternoon peak services (increasing after the first month to a train every five minutes) and every 10 minutes during off peak and on weekends.

There are approximately 100 CCTV cameras at every station and 38 cameras inside each train, with 600 secure bike parking spaces at Crows Nest, Victoria Cross, Waterloo and Sydenham, as part of 900 new bike parking spaces across all eight stations.

Platform screen door technology keeps riders away from tracks.

Minister for transport Jo Haylen says: "This is the biggest change to Sydney’s public transport system since the opening of the Sydney Harbour Bridge. It’s going to double rail capacity across our harbour, take pressure off our heavy rail network and deliver a fantastic new transport service for passengers right across our city.”

Sydney Metro chief executive Peter Regan says the new M1 City Line is open "after a year of testing and commissioning, including more than 200 simulated exercises that have included disruption, emergency scenarios and security drills".

For more information on companies in this article

Related Content

  • Bogota's metro tender delayed
    July 25, 2014
    The tender for Bogota, Colombia’s decades-long and much-delayed first metro line has been pushed to the first quarter of 2015 following expansion of the US$3.6 billion project. The original project included the construction of the first line of Bogota’s 26.5 kilometre long metro, which would have 28 stations and be used by around 600,000 people a day. This is the first of four lines planned to be built in the next 30 years. The metro will complement the existing urban transport system by handling 50 p
  • Siemens extends first driverless metro line in Paris
    October 14, 2014
    Siemens has received an order worth around US$57 million from Paris transit authority RATP (Régie Autonome des Transports Parisiens) to supply the train control equipment and operational control system for the extension of the driverless metro line 14 in Paris. Siemens will supply its Trainguard communication based train control (CBTC) type automatic train protection system, which enables driverless operation. Siemens equipped the original stretch of line 14 for automatic operation in 1998, establish
  • Hong Kong’s rail terminus goes ahead
    October 5, 2012
    With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day. The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.
  • Bike Share Toronto expands service
    July 19, 2019
    Bike Share Toronto is to add 1,250 bicycles, 105 stations and 2,292 docking stations to its network and will expand into new neighborhoods in the Canadian city. The deployment follows a commitment by the city’s mayor John Tory and the Toronto Parking Authority to extend bike-sharing services in the region. Tory says: “We will continue to push for the expansion of Bike Share to new neighbourhoods because we know it leads to increased ridership and membership for this important service.” Bike Sha