Skip to main content

'190,000 trips' on day 1 of Sydney Metro extension

15.5km extension means 2,645 new metro services will travel through city each week
By Adam Hill August 20, 2024 Read time: 2 mins
Lucky people (image: NSW Government | Sydney Metro)

More than 190,000 trips were made on the first day (19 August) of the Sydney Metro extension, according to NSW Government.

The new driverless service in the Australian city extends from the north-west, under the famous harbour for the first time, and through the Sydney central business district, with six brand-new underground stations - Crows Nest, Victoria Cross, Barangaroo, Martin Place, Gadigal and Waterloo - and new metro platforms at Central and Sydenham stations.  

The 15.5km extension is the latest stage of the M1 Northwest & Bankstown Line, which has stops at 21 stations between Tallawong and Sydenham. The remaining 13km of the M1 Line will open after the conversion of 10 existing stations on the T3 Bankstown Line.

Around 30 services per hour run at peak times, with capacity to move more people across Sydney Harbour in the busiest hour than the Sydney Harbour Bridge and Sydney Harbour Tunnel combined.

It means 2,645 new metro services will travel through the heart of the city each week, moving 17,000 people each way per hour in the morning rush hour.

A train runs every four minutes in the peak, seven minutes during weekdays between morning and afternoon peak services (increasing after the first month to a train every five minutes) and every 10 minutes during off peak and on weekends.

There are approximately 100 CCTV cameras at every station and 38 cameras inside each train, with 600 secure bike parking spaces at Crows Nest, Victoria Cross, Waterloo and Sydenham, as part of 900 new bike parking spaces across all eight stations.

Platform screen door technology keeps riders away from tracks.

Minister for transport Jo Haylen says: "This is the biggest change to Sydney’s public transport system since the opening of the Sydney Harbour Bridge. It’s going to double rail capacity across our harbour, take pressure off our heavy rail network and deliver a fantastic new transport service for passengers right across our city.”

Sydney Metro chief executive Peter Regan says the new M1 City Line is open "after a year of testing and commissioning, including more than 200 simulated exercises that have included disruption, emergency scenarios and security drills".

For more information on companies in this article

Related Content

  • Bombardier deploys new rail control solution in Kuala Lumpur
    July 26, 2017
    Bombardier Transportation’s fully-automated CITYFLO 650 rail control solution has entered service on second phase of new Klang Valley Mass Rapid Transit (KVMRT) Line 1 in Kuala Lumpur. Bombardier is equipping over 100 km of the KVMRT network with the technology, which offers operators optimised network capacity and heightened responsive traffic management. The system, which features a centralised control centre system and advanced radio-based communications, has been achieving high levels of availability si
  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • A new tube for London
    August 13, 2013
    London’s Tube network now carries over a billion passengers a year and demand keeps growing. Much of the infrastructure is very old, some dating back to the 1860s, so a major upgrade to increase capacity is essential. Transport for London has already upgraded the Jubilee and Victoria lines and significant progress is being made on the Northern line and also with the delivery of new trains, tracks and signals for the sub-surface railway – the Metropolitan, Hammersmith and City, District and Circle lines. Upg
  • A new tube for London
    August 13, 2013
    London’s Tube network now carries over a billion passengers a year and demand keeps growing. Much of the infrastructure is very old, some dating back to the 1860s, so a major upgrade to increase capacity is essential. Transport for London has already upgraded the Jubilee and Victoria lines and significant progress is being made on the Northern line and also with the delivery of new trains, tracks and signals for the sub-surface railway – the Metropolitan, Hammersmith and City, District and Circle lines. Upg