Skip to main content

NCDOT to install advance traffic warning system on I-277

The North Carolina Department of Transportation (NCDOT) is to install an advance warning system on the Interstate 277 (I-277) outer loop between Tryon Street and Interstate 77 in Charlotte, North Carolina. This system will detect traffic data such as volume and speed, alerting motorists to backups that frequently occur on the ramp from I-277 outer to I-77 north. The $188,000 project was awarded to Consolidated Power of Mooresville, who will install the detection warning system, consisting of two microwave
October 16, 2012 Read time: 2 mins
The 4775 North Carolina Department of Transportation (NCDOT) is to install an advance warning system on the Interstate 277 (I-277) outer loop between Tryon Street and Interstate 77 in Charlotte, North Carolina.

This system will detect traffic data such as volume and speed, alerting motorists to backups that frequently occur on the ramp from I-277 outer to I-77 north.

The $188,000 project was awarded to Consolidated Power of Mooresville, who will install the detection warning system, consisting of two microwave vehicle detection (MVD) units and two flashing LED beacons.  The MVD units will collect traffic data and send it to a processor on site for analysis; the system will then send a message to activate one or both of the flashing beacons.

Once traffic reaches speeds below 20 mph, the first beacon near the I-77 North exit ramp will activate. If traffic continues to back up toward Tryon Street, the second beacon will be activated. The contract also requires additional signage warning motorists of slow or stopped traffic.

NCDOT operates other similar detection systems on NC 58 in Carteret County, on I-26 in Polk and Henderson Counties, and on I-40 in Iredell County.

Related Content

  • June 30, 2014
    Ferrovial consortium to build I-77 HOT lanes
    Cintra, a US subsidiary of Spanish infrastructure firm Ferrovial, is to be responsible for the development of the I-77 HOT Lanes Project led by the North Carolina Department of Transportation (NCDOT). The US$655 million project, extending 26 miles from the I-77 connection with I-277 in Charlotte to the intersection with NC 150 in Iredell County, will enhance traffic connectivity between residential areas along the corridor and downtown Charlotte. The project includes the development of high occupancy tol
  • May 27, 2015
    Consortium wins US$648 million highway project
    I-77 Mobility Partners, a consortium led by Cintra Infraestructuras, a subsidiary of Ferrovial, has finalised a US$648 million contract with the North Carolina Department of Transportation. The group will design and construct 26 miles of toll lanes on Interstate 77 in North Carolina.
  • March 9, 2015
    Putting a stop to intersection indecision
    David Crawford takes a look at innovations to reduce crashes at rural intersections. Intersection crashes continue to represent a worryingly large share of deaths and serious injuries across US highway networks. Statistics from the US Department of Transportation’s Federal Highway Administration show that an average of 21% of road traffic accident deaths occur at crossings. The National Highway Traffic Safety Administration (NHTSA) calculates that intersection crashes account for 48% of all injury-related i
  • April 17, 2014
    NCDOT chooses PPP to improve I-77 traffic flow in Charlotte
    North Carolina Department of Transportation’s (NCDOT) has announced the apparent successful bidder for its first public-private-partnership (P3) contract to improve the traffic flow along 26 miles of I-77 in the Charlotte area, one of the most congested roadways in the state. It includes the development of HOT lanes in both directions. Following a required bidding process and pending final review Cintra Infraestructures will construct the I-77 project through a joint venture with F.A. Southeast, W.C. En