Skip to main content

Transit hub promised in San Diego area

San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations. This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces. “This will be our flagship station,” said Frank Owsiany, who ov
January 18, 2013 Read time: 2 mins
San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations.  This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces.

 “This will be our flagship station,” said Frank Owsiany, who oversees station improvements along the inland corridor for the 1789 San Diego Association of Governments, the region’s transportation planning agency.

Construction on what is said to be the ultimate I-15 transit hub, is expected to begin by late February or early March and should last about a year, Owsiany said.

The project is timed to be ready for the early 2014 launch of an expanded rapid bus service along I-15. That service promises to increase the frequency and shorten the routes of express buses that ferry passengers from stations in Escondido, Rancho Bernardo and other points south along the I-15 Express Lanes to job centers in Sorrento Valley and downtown San Diego.

The Sabre Springs project will require the closure of the station’s 150 parking spaces, which will be temporarily replaced at three park and rides along Sabre Springs Parkway. Owsiany said the station ramps that connect drivers to the freeway’s express lanes will remain open during construction.

Once complete, the parking garage will offer 537 spaces to go along with 93 additional surface lot spaces. Solar panels will be added on top of the structure, providing shade for cars on the top level, as well as providing a power source, he said.

Owsiany added that drivers will be able to call and reserve smart parking spots inside the station, where stalls will be lighted either green or red to show whether they have been reserved.

Related Content

  • February 13, 2018
    San Diego orders 50 CNG buses from New Flyer of America
    New Flyer of America has been awarded a contract by the San Diego Metropolitan System (MTS) to supply 50 Xcelsior compressed natural gas (CNG) buses with the intention of replacing existing models in the fleet over the next five years. The order supports MTS' state-of-good-repair efforts and its commitment to clean fuels. Additionally, MTS intends to use 17 of the sixty-foot, heavy duty transit buses currently in production for its new South Bay Rapid Transit (BRT) service expected to open later this yea
  • August 25, 2016
    Government funding for Lincoln transport hub
    The UK government has announced funding for the Lincoln transport hub, including a new bus station and 1,000 space car park. There will also be improvements to Lincoln Central railway station and a pedestrianised plaza connecting the bus and rail stations. As part of the upgrade, the new bus station will provide live travel information for both bus and rail passengers, while the 1,000 space multi-storey will have up to 32 electric vehicle charging points to power the next generation of vehicles. Cycle
  • March 31, 2016
    OCTA seeks proposals from three teams for I-405 freeway project
    The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re
  • November 9, 2012
    San Mateo Smart Corridor project
    San Mateo County in California is to implement a US$35 million dollar smart corridor project which will apply the latest management technology along twenty miles of El Camino Real from San Bruno to Menlo Park and on local streets in San Mateo County. “We’re working together to help people get to where they are going easier and faster,” said Caltrans Director Malcolm Dougherty. “This is a good example of how technology can help us make better use of the roads we already have.” The Intelligent Transportation