Skip to main content

Transit hub promised in San Diego area

San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations. This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces. “This will be our flagship station,” said Frank Owsiany, who ov
January 18, 2013 Read time: 2 mins
San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations.  This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces.

 “This will be our flagship station,” said Frank Owsiany, who oversees station improvements along the inland corridor for the 1789 San Diego Association of Governments, the region’s transportation planning agency.

Construction on what is said to be the ultimate I-15 transit hub, is expected to begin by late February or early March and should last about a year, Owsiany said.

The project is timed to be ready for the early 2014 launch of an expanded rapid bus service along I-15. That service promises to increase the frequency and shorten the routes of express buses that ferry passengers from stations in Escondido, Rancho Bernardo and other points south along the I-15 Express Lanes to job centers in Sorrento Valley and downtown San Diego.

The Sabre Springs project will require the closure of the station’s 150 parking spaces, which will be temporarily replaced at three park and rides along Sabre Springs Parkway. Owsiany said the station ramps that connect drivers to the freeway’s express lanes will remain open during construction.

Once complete, the parking garage will offer 537 spaces to go along with 93 additional surface lot spaces. Solar panels will be added on top of the structure, providing shade for cars on the top level, as well as providing a power source, he said.

Owsiany added that drivers will be able to call and reserve smart parking spots inside the station, where stalls will be lighted either green or red to show whether they have been reserved.

Related Content

  • January 25, 2012
    Los Angeles Express Lanes links multiple modes of transportation
    The Big Apple's loss is the City of Angels's gain, according to Ken Philmus
  • January 27, 2012
    Delcan to develop first multi-modal, real-time decision support system in US
    Delcan is to lead the effort to install a new, one of a kind integrated corridor management (ICM) system along a 35-km section of I-15 in San Diego, California. The system will make use of Delcan's Intelligent NETworks product, which will manage multiple modes of transportation and provide a real-time, multimodal decision support system (RTMDSS) that will implement and integrate technologies and concepts that have yet to be used in the United States.
  • September 8, 2014
    TSS shows Aimsun Online real-time traffic management system
    TSS-Transport Simulation Systems is showcasing its Aimsun Online real-time decision support system for traffic management. One of the most high-profile traffic management projects to use Aimsun Online as its prediction engine is the award-winning Interstate 15 Integrated Corridor Management (ICM) project led by the San Diego Association of Governments (SANDAG). At the core of the project is the configuration and implementation of a Decision Support System (DSS) using Aimsun Online.
  • January 27, 2012
    Benefits of traffic light synchronisation
    Alicia Parkway corridor, located in Orange County, California, was part of Phase 1 of an inter-jurisdictional Traffic Light Synchronisation Programme (TLSP) in Orange County designed to increase mobility and overall drive quality while reducing fuel consumption and greenhouse gas emissions. By increasing average speeds and reducing travel times via the reduction in stops, the programme sought to reduce vehicle acceleration and deceleration events along the corridor; these have been identified as the leadin