Skip to main content

Transit hub promised in San Diego area

San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations. This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces. “This will be our flagship station,” said Frank Owsiany, who ov
January 18, 2013 Read time: 2 mins
San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations.  This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces.

 “This will be our flagship station,” said Frank Owsiany, who oversees station improvements along the inland corridor for the 1789 San Diego Association of Governments, the region’s transportation planning agency.

Construction on what is said to be the ultimate I-15 transit hub, is expected to begin by late February or early March and should last about a year, Owsiany said.

The project is timed to be ready for the early 2014 launch of an expanded rapid bus service along I-15. That service promises to increase the frequency and shorten the routes of express buses that ferry passengers from stations in Escondido, Rancho Bernardo and other points south along the I-15 Express Lanes to job centers in Sorrento Valley and downtown San Diego.

The Sabre Springs project will require the closure of the station’s 150 parking spaces, which will be temporarily replaced at three park and rides along Sabre Springs Parkway. Owsiany said the station ramps that connect drivers to the freeway’s express lanes will remain open during construction.

Once complete, the parking garage will offer 537 spaces to go along with 93 additional surface lot spaces. Solar panels will be added on top of the structure, providing shade for cars on the top level, as well as providing a power source, he said.

Owsiany added that drivers will be able to call and reserve smart parking spots inside the station, where stalls will be lighted either green or red to show whether they have been reserved.

For more information on companies in this article

Related Content

  • Canada looks to HOT lanes to tackle congestion
    March 16, 2017
    David Crawford sees an evidence-based approach to HOT lane conversions. Canada’s first high occupancy toll (HOT) lanes opened on 16 September 2016 as a pilot on a 16.5km section of existing high occupancy vehicle (HOV) lanes running in both directions along Toronto’s Queen Elizabeth Way. Promised in two recent budgets
  • Applied Information to implement bus transit priority system in Atlanta
    June 15, 2018
    Applied Information is to provide traffic signal priority for Metropolitan Atlanta Rapid Transit Authority (MARTA) buses in a bid to make bus transit faster than car journeys in the city. Applied’s Glance Smart Cities Supervisory technology will be used at 23 intersections along Atlanta’s Campbellton Road Smart Corridor. The initiative, which also involves system integrator Temple, will be implemented between the Oakland City MARTA station and I-285 – an interstate loop which encircles Atlanta – and
  • Glasgow finalises its mobility-shift strategy
    February 14, 2024
    Scottish city wants 'far more sustainable and equitable modes' than the private car
  • ODoT selects AeroVironment for ‘Green Highway’
    April 20, 2012
    AeroVironment has been selected by the Oregon Department of Transportation (ODoT) to install its high-power Level 3 electric vehicle (EV) fast charging stations along the I-5 corridor from the California state line to the Willamette Valley. This is the beginning of the “Green Highway,” a vision for safe and consistent charging infrastructure spanning the West Coast, allowing EV drivers to travel with confidence from San Diego to Vancouver in Canada.