Skip to main content

Transit hub promised in San Diego area

San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations. This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces. “This will be our flagship station,” said Frank Owsiany, who ov
January 18, 2013 Read time: 2 mins
San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations.  This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces.

 “This will be our flagship station,” said Frank Owsiany, who oversees station improvements along the inland corridor for the 1789 San Diego Association of Governments, the region’s transportation planning agency.

Construction on what is said to be the ultimate I-15 transit hub, is expected to begin by late February or early March and should last about a year, Owsiany said.

The project is timed to be ready for the early 2014 launch of an expanded rapid bus service along I-15. That service promises to increase the frequency and shorten the routes of express buses that ferry passengers from stations in Escondido, Rancho Bernardo and other points south along the I-15 Express Lanes to job centers in Sorrento Valley and downtown San Diego.

The Sabre Springs project will require the closure of the station’s 150 parking spaces, which will be temporarily replaced at three park and rides along Sabre Springs Parkway. Owsiany said the station ramps that connect drivers to the freeway’s express lanes will remain open during construction.

Once complete, the parking garage will offer 537 spaces to go along with 93 additional surface lot spaces. Solar panels will be added on top of the structure, providing shade for cars on the top level, as well as providing a power source, he said.

Owsiany added that drivers will be able to call and reserve smart parking spots inside the station, where stalls will be lighted either green or red to show whether they have been reserved.

Related Content

  • April 29, 2020
    E-tolling is the new normal
    Electronic tolling has become a cornerstone for the next wave of innovation, says IBTTA’s Bill Cramer. So is this the end of the road for toll plazas?
  • May 11, 2017
    Pricing practise for HOT lane operation
    Timothy Compston weighs up the critical elements that keep the wheels of dynamic pricing schemes turning in today's high-occupancy toll (HOT) lanes. In the drive towards smarter tolling it is perhaps not surprising that sophisticated pricing algorithms are being rolled out to better reflect supply and demand on the roadway. This is the case with high-occupancy toll (HOT) lanes which a growing number of DoTs are seeing as a way of smoothing the operation of their existing, and planned, freeway infrastructure
  • June 13, 2013
    Bus/toll lanes proposed for Tampa Hillsboro area
    Toll and transit authorities in Tampa, Florida, are to jointly propose a first bus/toll lanes (BTL) project for the region this autumn. Tampa Hillsborough Expressway Authority (THEA) in Florida is developing a bus/toll lane (BTL) project in partnership with Hillsborough Area Regional Transit (HART), the regional governments' bus service provider. BTLs are toll managed lanes added to existing expressways that are designed for express transit buses plus toll-paying vehicles in volumes capped by dynamic prici
  • May 23, 2012
    Fort Collins gets grant for rapid-transit bus project
    The Federal Transit Administration (FTA) has awarded a US$54.5 million grant to the city of Fort Collins in Colorado for its MAX Bus Rapid Transit project. Nearly $3.9 million will also be given by the FTA for the project via its bus facilities and bus grant programme. That amounts the overall federal commitment to the project to some $69.4 million, 80 per cent of the project. The balance of funding is to come from the Colorado State University, Fort Collins, the Downtown Development Authority and the Colo