Skip to main content

Transit hub promised in San Diego area

San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations. This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces. “This will be our flagship station,” said Frank Owsiany, who ov
January 18, 2013 Read time: 2 mins
San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations.  This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces.

 “This will be our flagship station,” said Frank Owsiany, who oversees station improvements along the inland corridor for the 1789 San Diego Association of Governments, the region’s transportation planning agency.

Construction on what is said to be the ultimate I-15 transit hub, is expected to begin by late February or early March and should last about a year, Owsiany said.

The project is timed to be ready for the early 2014 launch of an expanded rapid bus service along I-15. That service promises to increase the frequency and shorten the routes of express buses that ferry passengers from stations in Escondido, Rancho Bernardo and other points south along the I-15 Express Lanes to job centers in Sorrento Valley and downtown San Diego.

The Sabre Springs project will require the closure of the station’s 150 parking spaces, which will be temporarily replaced at three park and rides along Sabre Springs Parkway. Owsiany said the station ramps that connect drivers to the freeway’s express lanes will remain open during construction.

Once complete, the parking garage will offer 537 spaces to go along with 93 additional surface lot spaces. Solar panels will be added on top of the structure, providing shade for cars on the top level, as well as providing a power source, he said.

Owsiany added that drivers will be able to call and reserve smart parking spots inside the station, where stalls will be lighted either green or red to show whether they have been reserved.

Related Content

  • May 27, 2016
    ITS America 2016 San Jose tours programme shows the present and future of ITS
    The major theme of Thursday, June 16, at ITS America 2016 San Jose will be a series of tours that exemplify intelligent transportation at work today and with an eye to the future. The Interstate 80 Integrated Corridor Mobility Project Tour will take in one of the most complex integrated Active Traffic Management systems in the country. This tour includes a stop at the Caltrans TMC in Oakland for an overview of system operations
  • May 26, 2016
    Viaduct deck renewal creates detour dilemma for MassDOT
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab
  • January 3, 2025
    $268m FTA grant for San Antonio rapid transit
    Via Rapid Green Line is planned to be up and running by late 2027
  • August 26, 2015
    San Diego to spend US$163 million to beat congestion
    Aiming to fight worsening traffic congestion on San Diego’s roads, city officials have created a US$163 million master plan to install modern stoplight timing systems and other advanced technologies that combat gridlock, says the San Diego Union-Tribune. The master plan, the first of its kind in city history, comes as many neighbourhoods are bracing for more dense developments to absorb the region’s growing population. In addition, recent analysis by the San Diego Association of Governments shows that