Skip to main content

Transit hub promised in San Diego area

San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations. This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces. “This will be our flagship station,” said Frank Owsiany, who ov
January 18, 2013 Read time: 2 mins
San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations.  This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces.

 “This will be our flagship station,” said Frank Owsiany, who oversees station improvements along the inland corridor for the 1789 San Diego Association of Governments, the region’s transportation planning agency.

Construction on what is said to be the ultimate I-15 transit hub, is expected to begin by late February or early March and should last about a year, Owsiany said.

The project is timed to be ready for the early 2014 launch of an expanded rapid bus service along I-15. That service promises to increase the frequency and shorten the routes of express buses that ferry passengers from stations in Escondido, Rancho Bernardo and other points south along the I-15 Express Lanes to job centers in Sorrento Valley and downtown San Diego.

The Sabre Springs project will require the closure of the station’s 150 parking spaces, which will be temporarily replaced at three park and rides along Sabre Springs Parkway. Owsiany said the station ramps that connect drivers to the freeway’s express lanes will remain open during construction.

Once complete, the parking garage will offer 537 spaces to go along with 93 additional surface lot spaces. Solar panels will be added on top of the structure, providing shade for cars on the top level, as well as providing a power source, he said.

Owsiany added that drivers will be able to call and reserve smart parking spots inside the station, where stalls will be lighted either green or red to show whether they have been reserved.

Related Content

  • June 3, 2016
    Another win for San Diego’s integrated corridor management system
    The San Diego Association of Governments (SANDAG) integrated corridor management (ICM) system on Interstate 15 in San Diego, California, has just received the California Transportation Foundation award for Operational Efficiency Program, for the second time in three years. This ICM project centres around a decision support system, for which TSS provides the Aimsun Online modelling tool. Thanks in part to the success of the ICM system, in 2015 USDOT added the SANDAG ICM network to the Dynamic Mobility
  • April 9, 2014
    Buses services benefit from seamless Wi-Fi data transfer
    Ted Bowser explains how the almost total Wi-Fi coverage at Ride-On’s new bus garage is providing big benefits for the operator and passengers alike. The ability to download and upload data to and from the various systems on board buses has become central to mass transit operators’ business model. So when Ride-On, the public transportation system in Maryland’s Montgomery County, was moving one of its three depots into a bigger and purpose-built facility, connectivity was a key consideration.
  • March 15, 2018
    Kapsch to upgrade toll systems for two San Diego highways
    The San Diego Association of Governments (SANDAG) has selected Kapsch TrafficCom (Kapsch) to upgrade toll systems on the interstate 15 (I-15) Express Lanes and the State Route 125 toll road (South Bay Expressway). The project aims to provide drivers with more seamless journeys that feature modern technology and streamlined maintenance and operation activities. It is expected to be completed in the second half of 2019. Through the agreement, Kapsch will replace all in-lane equipment with a software support
  • April 24, 2014
    California’s MTC expands Cubic Clipper card contract
    California’s Metropolitan Transportation Commission (MTC) has awarded Cubic Transportation Systems a US$7.5 million add-on contract to expand the Clipper card fare payment system to more than a dozen suburban transit agencies in the San Francisco Bay Area. The system, which Cubic delivered and operates, will enhance travel options for commuters in parts of the East and North Bay. Under the updated contract, Cubic will install and configure Clipper fare collection equipment on all East Bay and North Bay o