Skip to main content

WSP USA awarded Illinois Tollway system consulting engineer contract

The Illinois State Toll Highway Authority has appointed WSP USA as the agency’s independent consulting engineer for engineering projects associated with the Illinois Tollway. Under the 54-month contract, WSP will work on a number of current and future tollway projects planned by the Authority. These include the 22-mile Tri-State Tollway Expansion, set to begin design in 2018, the ongoing design and construction of the Elgin O’Hare Western Access Project
September 15, 2017 Read time: 1 min

The Illinois State Toll Highway Authority has appointed WSP USA as the agency’s independent consulting engineer for engineering projects associated with the Illinois Tollway.

Under the 54-month contract, WSP will work on a number of current and future tollway projects planned by the Authority. These include the 22-mile Tri-State Tollway Expansion, set to begin design in 2018, the ongoing design and construction of the Elgin O’Hare Western Access Project, and other projects included in the Move Illinois Capital Program.

WSP will be responsible for multiple tasks including environmental reviews and assistance, plan reviews, project management, drainage and structural engineering support, and manual reviews and updates. Additional technical services will include review of overweight permits, project control support and construction audits. WSP will also oversee annual inspections of the tollway system and facilities and provide an annual report of the major accomplishments, state of repair and plans for upcoming work.

Related Content

  • TomTom and Elgin partner to deliver insights into the impact of UK roadworks
    November 18, 2016
    TomTom and Elgin are to collaborate to in a bid to deliver more accurate and validated real-time traffic information to drivers, fleet managers and traffic management professionals. TomTom Traffic in the United Kingdom now includes relevant roadworks and traffic management information from Elgin. This collaboration ultimately enables drivers to reach their destinations more quickly and highway authorities and utility companies to monitor and respond to the impact of roadworks on road users in real-time.
  • Wabtec announces PTC contracts with Metra
    December 18, 2015
    Wabtec Corporation has signed contracts worth about US$45 million Metra and Parsons Transportation Group (PTG) to provide equipment and services for a Positive Train Control (PTC) system for the Northeast Illinois Regional Commuter Railroad Corporation (Metra). Metra operates commuter rail service in Chicago and its surrounding suburbs, serving more than 100 communities at 241 rail stations, with a fleet of 146 locomotives, 843 passenger cars and 185 electric-propelled cars. Under the contracts, Wa
  • Route options unveiled for new toll link road in Staffordshire
    December 8, 2014
    The Highways Agency has unveiled three possible route options for a new link road between the M54, the northbound M6 and the M6 Toll in Staffordshire. The plans are on show at exhibitions starting today, marking the start of an eight-week public consultation for the scheme, which will reduce congestion on local roads, improve safety and support economic growth in the surrounding area – all part of the government’s long term economic plan. Highway Agency Project Manager Bill Birkett said: “It is import
  • D'Artagnan to prepare road usage charge demonstration implementation plan for WSTC
    May 6, 2016
    D'Artagnan Consulting has been awarded a contract by the Washington State Transportation Commission (WSTC) to prepare a detailed state-wide road usage charge (RUC) demonstration implementation plan in preparation for a project expected to start in 2017. The company is working with Berk Consulting, WSP/Parsons Brinckerhoff and several DBE firms and the work will entail updating the WSTC body of materials assessing RUC since 2012 that was successfully completed at the direction of the State Legislature.