Skip to main content

Real-time driving data reveals rush hour congestion on London’s road during tube strike

Following the warning by London Underground chiefs of tube strikes until lunchtime Wednesday 8 February, Waze, the real-time crowd-sourced sat nav app, issued data collected during the strike on 9 January to show, for the first time, just how badly London's commuters are affected by strike action. According to Waze, on 9th January, data at the peak-time 8.05am showed that 24 per cent of traffic was bumper to bumper– effectively standstill; at this time on a normal day it is usually around 12 per cent. Th
February 6, 2017 Read time: 2 mins
Following the warning by London Underground chiefs of tube strikes until lunchtime Wednesday 8 February, 6897 Waze, the real-time crowd-sourced sat nav app, issued data collected during the strike on 9 January to show, for the first time, just how badly London's commuters are affected by strike action.

According to Waze, on 9th January, data at the peak-time 8.05am showed that 24 per cent of traffic was bumper to bumper– effectively standstill; at this time on a normal day it is usually around 12 per cent. There was also 34 per cent heavy traffic, so nearly 60 per cent of total traffic at crawling or worse. Trips took on average 1hr 12 minutes longer than usual to get from Uxbridge to East Acton when approaching city from the West.

Waze says the worst routes included Temple to Trafalgar Square (1 mile) which took 40 minutes (34 minutes more than usual). By comparison, this route should take 13 minutes to walk.

On Brecknock Road, Kentish Town, speed was down to 1mph, taking 33 minutes longer than usual to travel from Brecknock Road to Junction Road in North London.

The M4 motorway near Chiswick was jammed, adding 25 minutes to the drive.

Many roads in central London were running slow, adding 20-35 minutes to travel under two miles.

During the evening rush hour period, follow up statistics at 5.30pm showed 25 per cent of London was at a standstill and 35 per cent of the capital was stuck in heavy traffic, travelling at under 5 mph.

For more information on companies in this article

Related Content

  • Contracts awarded for London’s traffic signals upgrade
    July 18, 2014
    Transport for London (TfL) has awarded new traffic signals maintenance contracts, worth around US$542 million for up to eight years, which will see the capital’s 6,000 traffic signals upgraded and maintained to the latest, greenest standards. Awarded to Telent Technology Services for west and south-west London, Siemens for north and north-west London and Cubic Transportation Systems for south-east London, the new Traffic Control Management Services contracts will help expand the use of intelligent traf
  • Government traffic statistics ‘highlight a growing issue in the UK’
    August 12, 2016
    The UK Department for Transport has issued its provisional estimates of road traffic in Great Britain for the year ending June 2016 by vehicle type and road class. These show that motor vehicle traffic was at a record high with 319.3 billion vehicle miles travelled, at 1.5 per cent higher than the previous year and 1.6 per cent higher than September 2007). Rolling annual motor vehicle traffic has now increased each quarter in succession for three years. Compared to the previous year, all road class
  • Pittsburgh reveals pedestrian crash rates 
    July 20, 2021
    Nearly 90% of crashes occurred within 500 feet of a transit stop, says startling new report
  • London's new Silvertown Tunnel set to open
    January 13, 2025
    TfL says average peak journey times expected to be 20 minutes quicker