Skip to main content

WSP/Parsons Brinckerhoff to manage California HOV project

The Contra Costa Transportation Authority in California, US, has awarded a contract to WSP/Parsons Brinckerhoff for construction management services for the completion of the I-680 HOV (high-occupancy vehicle) Express Lanes project. The Authority, in cooperation with the California Department of Transportation, Metropolitan Transportation Commission, and the Federal Highway Administration, seeks to improve traffic operations and relieve congestion with the construction of HOV express lanes on southbound
October 28, 2016 Read time: 2 mins
The Contra Costa Transportation Authority in California, US, has awarded a contract to 8556 WSP | Parsons Brinckerhoff for construction management services for the completion of the I-680 HOV (high-occupancy vehicle) Express Lanes project.

The Authority, in cooperation with the California Department of Transportation, Metropolitan Transportation Commission, and the Federal Highway Administration, seeks to improve traffic operations and relieve congestion with the construction of HOV express lanes on southbound I-680 between Treat Boulevard and Rudgear Road. The existing southbound I-680 HOV lane will be converted to an express lane from Marina Vista to Treat Boulevard and operational improvements will be made to the southbound I-680 express lane between Rudgear Road and El Cerro Boulevard.

As construction manager, WSP/Parsons Brinckerhoff is responsible for a range of services including constructability review, bid management, survey and staking, inspection, schedule analysis, permit monitoring and reporting, quality assurance, material testing, submittal review, and claim and conflict resolution.

The project is scheduled to be completed in June 2020.

For more information on companies in this article

Related Content

  • Open Roads collaborates with Virginia DOT on the 495 Express Lanes project
    December 11, 2012
    Opened on 17 November, the fourteen-mile corridor of new high occupancy toll (HOT) lanes in Northern Virginia from the Springfield Interchange to just north of the Dulles Toll Road on the Virginia side of the Capital Beltway provides drivers with a faster, more predictable trip on the Capital Beltway. The 495 Express Lanes project supported more than 16,000 jobs and generated nearly US$3.5 billion of economic impact state-wide. Intelligent Transportation Systems (ITS) provider Open Roads Consulting (Open R
  • Managing congestion, better information changes perceptions
    January 31, 2012
    Kapsch's Dietrich Leihs talks about the true fundamentals of urban pricing. In some Italian and German towns and cities, the solution to congestion is an outright ban on certain types of vehicles. As far as Dietrich Leihs is concerned, any attempt to sweeten the pill that is congestion charging is only ever going to be a partial success at best.
  • Waycare helps manage Ohio traffic 
    January 6, 2021
    Platform has reduced average accident response time in South Nevada RTC, firm says
  • IRD awarded Wisconsin weigh-in-motion project
    January 21, 2015
    International Road Dynamics (IRD) has been awarded a US$1.7 million contract by Chippewa Concrete Services of Wisconsin to supply, install and maintain a weigh-in-motion (WIM) sorting system at the Douglas County Safety and Weight Enforcement Facility (SWEF). The project is to be completed by the summer of 2016. IRD will supply and install its patented WIM scales, iSINC electronics, video verification system, vehicle movement compliance system and associated operational software. The system will allow