Skip to main content

Open Roads collaborates with Virginia DOT on the 495 Express Lanes project

Opened on 17 November, the fourteen-mile corridor of new high occupancy toll (HOT) lanes in Northern Virginia from the Springfield Interchange to just north of the Dulles Toll Road on the Virginia side of the Capital Beltway provides drivers with a faster, more predictable trip on the Capital Beltway. The 495 Express Lanes project supported more than 16,000 jobs and generated nearly US$3.5 billion of economic impact state-wide. Intelligent Transportation Systems (ITS) provider Open Roads Consulting (Open R
December 11, 2012 Read time: 2 mins
Opened on 17 November, the fourteen-mile corridor of new high occupancy toll (HOT) lanes  in Northern Virginia from the Springfield Interchange to just north of the Dulles Toll Road on the Virginia side of the Capital Beltway provides drivers with a faster, more predictable trip on the Capital Beltway. The 495 Express Lanes project supported more than 16,000 jobs and generated nearly US$3.5 billion of economic impact state-wide.

Intelligent Transportation Systems (ITS) provider 5660 Open Roads Consulting (Open Roads) collaborated with the 1747 Virginia Department of Transportation (VDOT) and roads operator 600 Transurban to develop an interface that integrates the 495 Express Lanes Transportation Management System (TMS) and the Northern Virginia Public Safety and Transportation Operations Center (PSTOC) Advanced Transportation Management System.

The system, OpenTMS Enterprise System, was developed and deployed by Open Roads. The interface is designed to share different types of data between the two systems: incidents, work zones, DMS (dynamic message sign), traffic sensor, travel time, and weather station data.  Open Roads worked closely with VDOT and Transurban to define the system interface requirements, software functional requirements, current user interface to incorporate the HOT lanes information for use by the PSTOC management and staff. VDOT and Open Roads have made tremendous efforts to create situational awareness to deliver improved safety and travel times to the motoring public in the region.

Governor Bob McDonnell participated in an opening event celebration in Tysons Corner with elected officials, media and key project personnel to commemorate the opening of the new traffic solution. He commented that the opening of the 495 Express Lanes means opportunity for Virginia as the project not only helped create jobs during construction, but will continue to make Northern Virginia a more attractive place to work and live. He also stated that the Express Lanes will open the region for business by providing better access to key employer centers and delivering the infrastructure needed to grow businesses and create additional jobs.

Related Content

  • August 8, 2012
    Construction begins on $1 billion I-95 Express Lanes in Northern Virginia
    Surrounded by elected officials, transportation engineers, and dignitaries, Virginia Governor Bob McDonnell held a groundbreaking ceremony yesterday to begin construction of the I-95 Express Lanes in Northern Virginia. The project will build 29 miles (46.7kms) of express lanes on I-95 from Garrisonville Road in Stafford County to Edsall Road in Fairfax County, and will connect the I-95 Express Lanes to the I-495 Express Lanes currently under construction to provide a seamless network of new lanes to reduce
  • August 14, 2012
    TÜV Rheinland to provide support for UAT for Virginia’s 495 Express Lanes
    TÜV Rheinland’s ITS group has been selected to provide user acceptance testing (UAT) support for the 495 Express Lanes, the new high-occupancy toll (HOT) lanes opening on the Virginia side of the I-495/Capital Beltway at the end of this year. The project is one of the largest transportation endeavours in the US, aiming to ease traffic on one of the country’s most congested corridors and UAT is a key testing component of the project that will involve testing all aspects of the Express Lanes tolling hardware
  • October 19, 2012
    Dynamic toll payments on Virginia’s 495 express lanes
    Private sector operator, Transurban, operators of Virginia’s I-495 express lane, has unveiled the highway’s incident management centre where the flow of vehicles will be monitored on a widescreen monitor displaying a dozen camera angles. The new lanes are expected to open by the end of fall. The centre will monitor traffic volume 24/7 in order to compute toll rates. The new roadway, connecting the Dulles toll road to the I-395/I-95/Springfield interchange fourteen miles to the south, will charge drivers dyn
  • June 25, 2013
    495 Express Lanes speed limit increased
    Drivers using the 495 Express Lanes high occupancy toll road in north Virginia will benefit from the announcement that the speed limit is to be increased 65 miles per hour. The speed increase follows extensive safety studies and will help drivers save even more time when travelling on the Capital Beltway. The speed limit on the mainline Beltway lanes will remain at 55 mph. The 495 Express Lanes operate 24 hours a day, seven days a week. Dynamic pricing based on real-time traffic conditions manages the de