Skip to main content

Victorian Government to fund second river crossing

The Victorian Government in Australia is to provide the full funding for the Western Distributor Project, a second river crossing which includes the Monash Freeway Upgrade and upgrades to Webb Dock, after the Federal Government rejected a request for a contribution to the funding. Construction of the US$4.2 billion (AU$5.5 billion) Western Distributor will start in 2017, local motorists paying for the rest of it with tolls extended until 2045. The Government and Transurban in Australia have now signed
April 18, 2016 Read time: 2 mins
The Victorian Government in Australia is to provide the full funding for the Western Distributor Project, a second river crossing which includes the Monash Freeway Upgrade and upgrades to Webb Dock, after the Federal Government rejected a request for a contribution to the funding.

Construction of the US$4.2 billion (AU$5.5 billion) Western Distributor will start in 2017, local motorists paying for the rest of it with tolls extended until 2045.

The Government and Transurban in Australia have now signed an agreement on processes for the tender, planning and engagement stages and announced the establishment of the Western Distributor Authority to get the project completed.

They have also released the first full designs which include two options for connecting the West Gate Freeway to the Western Distributor Tunnel, either directly within the road reserve, or via ramps to a portal in adjacent land.

Key features include: a tunnel under Yarraville and a second river crossing over the Maribyrnong; the longest managed motorway system in Australia from Geelong to Pakenham; 4.5km of new cycling and pedestrian paths including completion of the Federation Trail; Widening the Monash Freeway in two places.

To get dangerous goods trucks, which can’t travel in a tunnel, out of residential streets, the designs include five ramp options to connect the West Gate Freeway directly to Hyde Street.

Related Content

  • October 31, 2022
    ITS from Indra helps Colombia tunnels
    Tolling and communications are also major part of new Latin American infrastructure project
  • May 3, 2017
    Countering truckers’ parking conundrum
    Colin Sowman hears about a new truck parking information system being piloted across eight states. Legislation limits truck drivers’ hours with the result that they are often caught in a situation where they need to stop either for a break or an overnight rest. But as truck parking is in short supply, truck drivers spend an average of 56 minutes a day searching for available spaces and are often faced with the choice of driving beyond their permitted hours or parking illegally.
  • June 27, 2024
    Indra brings in Citilog for Silvertown Tunnel incident detection
    System will help reduce congestion in and around tunnel under River Thames in London
  • May 19, 2017
    Comprehensive communications combats tolling resistance
    Toll road operator must provide clear, comprehensive and consistent communications to user groups and the local community long before the facility opens. When new tolled highway infrastructure is about to go into service, the construction, management and finance specialists who brought it into being are about ready for a well-deserved celebration. But for the communications and outreach team responsible for building public support for the project – for bringing drivers to the road, and keeping partners and