Skip to main content

San Francisco Bay Bridge east span opens

After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span. The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.
September 5, 2013 Read time: 1 min
After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span.

The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.

One of the busiest spans in the United States, the single-towered, 634 metre long self-anchored main span is more than twice the length of the previous record holders, Japan's Konohana Bridge and South Korea's Yeongjong Grand Bridge, according to the Structurae engineering database.

It has been completed six years behind schedule at five times over budget. It will be used by some 280,000 daily commuters.

Related Content

  • Chile plans feasibility studies to extend three metro lines
    March 14, 2014
    Chile's transport ministry plans to launch feasibility studies to extend three metro lines in the capital, Santiago. The plans include expanding the north-south line 2 south towards El Bosque and San Bernardo neighbourhoods and line 3, currently under construction, north to Quilicura, according to transport minister Andrés Gómez-Lobo. The other proposal is to expand further south line 4, which connects Santiago's eastern neighbourhood of Providencia with the town of Puente Alto to the southeast of the
  • Speeding the recovery of stranded commercial vehicles is paying dividends in Georgia
    April 9, 2014
    Delcan’s Cheryl-Marie Hansberger details how Georgia’s Towing and Recovery Incentive Program (TRIP) has improved road safety and helped to reduce traffic congestion in the metro Atlanta region. By 2008, steady increases in population had led the Texas Transportation Institute to declare Atlanta, Georgia to be the third most congested city in the US. In an effort to increase road user safety and mitigate the effects of traffic, the Georgia Department of Transportation (GDOT) and its local partners have imple
  • Malaysia to invest billions in rail development
    September 12, 2013
    Malaysia plans to spend a staggering US$50 billion to develop its rail network over the next seven years, including a high-speed rail linking Kuala Lumpur and Singapore set for 2020, and the urban mass rapid transit system that is rolling out in 2017. Compared to developed countries where rail transport makes up a third of public transportation, Malaysia's share is less than four per cent.
  • Charging station infrastructure boost to electric vehicle use
    July 17, 2012
    The first section of a planned network of stations for charging electric vehicles – the West Coast Electric Highway – opened in March, promising a welcome boost to the environment and economy of Oregon. Pete Goldin reports What should come first, the electric vehicle or the charging station? This dilemma has been hindering proliferation of ‘EVs’ in the US for years. Without a widespread and reliable infrastructure of charging stations, the American public is not likely to adopt EVs en masse. This may all b