Skip to main content

San Francisco Bay Bridge east span opens

After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span. The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.
September 5, 2013 Read time: 1 min
After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span.

The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.

One of the busiest spans in the United States, the single-towered, 634 metre long self-anchored main span is more than twice the length of the previous record holders, Japan's Konohana Bridge and South Korea's Yeongjong Grand Bridge, according to the Structurae engineering database.

It has been completed six years behind schedule at five times over budget. It will be used by some 280,000 daily commuters.

Related Content

  • Norway gets ready for more EVs
    September 14, 2021
    Norway’s road transport network is changing radically. The country is gearing up for greater electric vehicle use as well as gradually phasing out its traditional ferry links
  • Infrastructure spending is an investment in economic recovery
    January 20, 2012
    Transportation funding is caught in the crossfire as the President calls for infrastructure investment and a reinvigorated Republican majority in the House pushes back on federal spending. Andrew Bardin Williams reports. Every few months some politician or pundit declares that the country is on the verge of making the most important political decision in a generation. The 2006 mid-term election; the 2008 Presidential election; the passing of the stimulus bill; healthcare reform; the mania surrounding Tea Pa
  • Historic $106 million annual public-private transit agreement
    March 27, 2012
    In a historic and unanimous vote, the Nassau County Legislature, Long Island, New York, has approved a contract with Veolia Transportation to manage the county's bus and paratransit system under a new public-private operating partnership to commence January 1, 2012. The value of the contract is US$106 million annually and makes Veolia Transportation the service provider of four of the top five largest transit contracts in the US, including Nassau County, Las Vegas, Phoenix, and New Orleans. The company won
  • Norway to renovate 200 tunnels
    August 12, 2013
    The Norwegian Public Roads Administration (Statens Vegvesen) has to renovate 200 tunnels before 1 April 2019 to meet European Union safety requirements for tunnels. Norway’s Tunnel Safety Regulations 2007 apply to tunnels on state roads that are more than 500 metres long, of which Norway has 253. Thirty of these were built after 2007 and comply with the regulations, while only around twenty tunnels built after 2007 have been renovated. The authority will present an action program for the 2014-2017 period