Skip to main content

San Francisco Bay Bridge east span opens

After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span. The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.
September 5, 2013 Read time: 1 min
After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span.

The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.

One of the busiest spans in the United States, the single-towered, 634 metre long self-anchored main span is more than twice the length of the previous record holders, Japan's Konohana Bridge and South Korea's Yeongjong Grand Bridge, according to the Structurae engineering database.

It has been completed six years behind schedule at five times over budget. It will be used by some 280,000 daily commuters.

Related Content

  • Kistler to showcase bridge monitoring portfolio
    March 20, 2024
    For the first time, Kistler will showcase its complete Structural Health Monitoring portfolio for bridge protection and traffic safety at Intertraffic.
  • Olympic challenges in Sochi
    May 27, 2014
    Sporting events always create problems for traffic planners and none more so than the Winter Olympics. It is difficult to think of more diametrically opposite challenges for transport planners than the 2012 Olympics in London and this year’s Winter Olympics in Sochi: from a summer event in the heart of a megacity with well established transport infrastructure to winter games with unpredictable weather and events in remote and mountainous locations. The Winter Games are always a challenge and Sochi was no di
  • San Francisco Bay Area transit systems extend Cubic operations contract
    August 1, 2017
    Cubic Transportation Systems (CTS) has been awarded a contract extension of up to five years from the Metropolitan Transportation Commission (MTC) for operations and maintenance services supporting the regional Clipper card fare payment system in the San Francisco Bay Area. The extended contract period is from November 2019 to November 2024 and is valued at approximately US$25 million per year. MTC is the transportation planning, financing and coordinating agency for the nine-county San Francisco Bay Area.
  • Kapsch wins in Australia
    December 20, 2013
    Kapsch TrafficCom has been appointed to deliver two high profile electronic tolling projects in Australia. The contracts will see Kapsch TrafficCom deliver multi-lane free-flow (MLFF) tolling solutions on the Eastern Distributor toll road in Sydney and the Legacy Way toll road in Brisbane using Kapsch multi-lane free-flow single gantry technology. Kapsch TrafficCom’s single gantry solution will be deployed in both projects and to provide stereoscopic vehicle detection and classification, front and rear l