Skip to main content

San Francisco Bay Bridge east span opens

After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span. The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.
September 5, 2013 Read time: 1 min
After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span.

The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.

One of the busiest spans in the United States, the single-towered, 634 metre long self-anchored main span is more than twice the length of the previous record holders, Japan's Konohana Bridge and South Korea's Yeongjong Grand Bridge, according to the Structurae engineering database.

It has been completed six years behind schedule at five times over budget. It will be used by some 280,000 daily commuters.

Related Content

  • Ertico is looking east: here’s why
    March 3, 2020
    The first Central Eastern Congress on ITS is to be held in Russia in September. Jacob Bangsgaard, CEO of Ertico – ITS Europe, tells Adam Hill why the event is necessary – and what visitors can expect
  • Activu and Mitsubishi give New Jersey controllers the big picture
    May 27, 2014
    Mitsubishi and Activu team up to help New Jersey emergency centre with real-time situational awareness. Sandy was the largest Atlantic hurricane in recorded history, with winds spanning an area of 1,100 miles and damages estimated at $68 billion. It killed at least 286 people in seven countries, from Jamaica to the Jersey Shore. But tropical storms are not the only challenge for emergency operations up and down the East Coast.
  • Hartford’s tailors winter maintenance on Esri’s GIS platform
    August 5, 2016
    The in-house winter maintenance and vehicle tracking system built by the Public Works Department in Hartford, Connecticut, coped with record snowfalls and cut costs too. When it comes to dealing with the effects of mother nature, transport agencies can find themselves in a lose-lose situation: criticised if the roads or rail lines are disrupted by snow, ice or floods for more than a few hours and lambasted for wasting money if the equipment and stockpiles put in place for a hard winter remain unused.
  • San Francisco bans facial recognition
    July 23, 2019
    San Francisco has become the first US city to ban facial recognition software – and it is a move which has implications for transit agencies as well as police forces worldwide Big Brother is watching you’, goes the famous saying. Well, not in San Francisco he isn’t. Legislators in the Californian city – home to the tech gold rush and embracers of all things forward-looking – have decided that, after all, there should be limits to technology’s hold over us. By a margin of eight votes to one, the city’s