Skip to main content

San Francisco Bay Bridge east span opens

After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span. The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.
September 5, 2013 Read time: 1 min
After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span.

The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.

One of the busiest spans in the United States, the single-towered, 634 metre long self-anchored main span is more than twice the length of the previous record holders, Japan's Konohana Bridge and South Korea's Yeongjong Grand Bridge, according to the Structurae engineering database.

It has been completed six years behind schedule at five times over budget. It will be used by some 280,000 daily commuters.

Related Content

  • TransCore wins contract on new HOV to Express lane conversion
    April 3, 2012
    California’s Santa Clara Valley Transportation Authority (VTA) has launched the first phase of its 290km conversion of high occupancy vehicle (HOV) lanes to Express Lanes, or commonly known as high occupancy toll (HOT) lanes, with TransCore serving as lead integrator for the project. The US$11.8 million programme comes at a crucial time in Silicon Valley as it prepares for an expected 38 per cent growth in population over the next 20 years and funding for transportation improvements is projected to grow at
  • WSP/Parsons Brinckerhoff designing new bridge in Florida
    November 15, 2016
    WSP /Parsons Brinckerhoff will design a new bridge in Pensacola, Florida as part of a design-build team led by Skanska. The project is being undertaken on behalf of the Florida Department of Transportation. The US$398.5 million project includes design and construction of new westbound and eastbound bridges on Route 30 (US 98) to replace the existing three-mile-long bridge that links the communities of Pensacola and Gulf Breeze. The project also includes shared-use paths on the outside of each bridge, rec
  • Kapsch ‘opens the way’ to interoperability
    July 30, 2013
    Richard Turnock, chief technology officer of Kapsch TrafficCom North America explains what advantages its newly-opened TDM protocol can offer as a US-wide standard for tolling interoperability. The electronic tolling industry across the United States is evolving. Historically it was characterised by clusters of interoperability where a motorist may be able to use the same transponder across a large area, such as the 15-State E-ZPass system, or be confined to a single State system. Now, however, the industry
  • Upgrade for traffic counting system on Delaware bridges
    April 29, 2016
    The Delaware River Joint Toll Bridge Commission recently approved the purchase of new technology and software to replace the aging traffic counting system at the agency's 18 road bridges. The US$268,724 purchase of radar traffic counters, auxiliary system and software will be made from Signal Services of West Chester, Pennsylvania through the Pennsylvania Department of General Services COSTARS Program. The Commission collects traffic counts to make data-driven decisions related to budgeting, maintenance an