Skip to main content

San Francisco Bay Bridge east span opens

After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span. The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.
September 5, 2013 Read time: 1 min
After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span.

The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.

One of the busiest spans in the United States, the single-towered, 634 metre long self-anchored main span is more than twice the length of the previous record holders, Japan's Konohana Bridge and South Korea's Yeongjong Grand Bridge, according to the Structurae engineering database.

It has been completed six years behind schedule at five times over budget. It will be used by some 280,000 daily commuters.

Related Content

  • Wireless bridges widen options for ITS upgrades
    December 9, 2014
    Antaira Technologies’ marketing engineer Brian Roth explains why the increasing capacity of wireless bridges is reducing the cost of expanding and upgrading ITS networks. With more than half of the world’s population now living in cities, the need for efficient transportation of both people and goods has never been greater and that pressure is unlikely to ease any time soon. Indeed in many regions of the world the rate of urbanisation is still increasing as the demand for rural workers continues to decline.
  • Diverse development of tolling business models
    April 25, 2013
    A diversity of tolling business models offers a wider toolbox of highway finance options, as the IBTTA’s Patrick Jones explains. The business models for America’s tolled highways have gone through several different evolutions over the last 75 years, reflecting a succession of shifts in transportation policy and politics, financing and funding models, urban patterns, customer needs, and technology. And with more and more decision-makers expressing renewed interest in tolling, it’s that very diversity that ma
  • Viaduct deck renewal creates detour dilemma for MassDOT
    May 26, 2016
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab
  • McCain scoops San Francisco controller cabinet order
    May 14, 2014
    Known for its high foot-traffic, congested streets and short blocks, the flow of pedestrian traffic plays a major role in San Francisco’s transportation network. Traffic controller maintenance adds to the problem where the cabinets have single front doors that obstruct pedestrian walkways, restricting the flow of foot traffic, and often forcing rerouting and delays. That’s about to change; the City has awarded McCain a contract for the supply of traffic controller cabinets, including the City’s first-ti