Skip to main content

Ohio Turnpike launches $250m modernised toll collection system

E-ZPass entry and exit gates have been removed at 20 toll plazas on 241-mile route
By Adam Hill April 12, 2024 Read time: 3 mins
Ohio Turnpike's new Westgate Toll Plaza (image: Ohio Turnpike and Infrastructure Commission)

The Ohio Turnpike and Infrastructure Commission’s new toll collection system has gone live on a 241-mile route comprising Interstate 80, I-90 and I-76.

The $250 million construction project, funded by toll revenue, is the largest in Ohio Turnpike's history and includes upgrades to electronic tolling in some places and new message signs for motorists.

The system now features a combination of open-road tolling lanes for E-ZPass customers and a gated exit system for non-E-ZPass customers who can pay by cash or credit card.

E-ZPass entry and exit gates have been removed at 20 toll plazas. In 2023, combined E-ZPass use on the network by car and truck customers was 74.1%, a rise of 0.7% from 2022.

Nine toll plazas no longer charge tolls, which means cash customers don't have to stop to get a ticket or pay a toll, and E-ZPass transponders will no longer be read. Overhead signs on the gantry now read: “NO TOLL, KEEP MOVING.”

This modernisation has been five years in the making; the first contract was approved in 2019. The first phase of the project, which permanently opened the entry gates in all E-ZPass toll booth lanes, was deployed at 20 interchanges from Toll Plaza 52 (Toledo Airport-Swanton) in Lucas County to Toll Plaza 209 (Warren) in Trumbull County. The exit gates in all dedicated E-ZPass lanes were opened.

At these interchanges, 127 lanes were upgraded with new electronic tolling components, including sensors and other equipment to read E-ZPass transponders, and to classify vehicles by the number of axles and vehicle height.

Automated toll payment machines, which accept cash and credit cards, were installed at all 20 toll plaza interchanges as well as the four mainline toll plazas.

Two new plazas, Swanton Toll Plaza (milepost 49) in Lucas County and Newton Falls Toll Plaza (milepost 211) in Trumbull County, have opened, forming the new ends of the ticketed toll system.

E-ZPass customers can travel non-stop at highway speeds on the dedicated open-road tolling lanes in both directions.

“The modernisation of the toll collection system has been a long, challenging and complex project," said Ohio Turnpike executive director Ferzan Ahmed. 

“The launch of the new toll collection system, which includes open-road tolling, the removal of all gates in E-ZPass entrance and exit lanes, and enhancements to our customer service centre, and more, are significant milestones."

Ahmed emphasised the economic benefits of modernisation. "The local, regional and national economic benefits of our top-performing facility will be immense for our commuters, travellers, as well as the commercial freight industry," he said.

“In the coming weeks and months, we will continue to monitor the performance of the new system, and close out various projects as they are completed.”

Related Content

  • December 19, 2013
    Maine toll road evaluates AET
    A new ten year plan released by the Maine Turnpike Authority defers decisions on work to upgrade its three largest toll plazas pending completion of a next generation toll collection study that will consider the costs and benefits of going all-electronic, versus open road electronic tolling (ORT) and cash and a timetable. Objections from local residents and the failure of the Turnpike to consider the alternative of all-electronic tolling (AET) led to the delay of a previous ten year plan in 2009 that set
  • February 1, 2012
    No in-road equipment for Queensland's free flow toll bridge
    By May this year, the new Gateway Bridge in Brisbane, which is being built alongside an existing bridge, will be open. With it will come an end-to-end free-flow tolling system. Interview with Sue Caelers, Queensland Motorway Ltd. Queensland Motorways Ltd owns and operates 61km of roadway in the area around Brisbane, Australia. This includes the Gateway Bridge and the Gateway Extension, Logan and Port of Brisbane motorways.
  • April 25, 2013
    Upgrading Turkey's tolling system
    A programme modernising road tolling equipment on Turkey’s national highway network has resulted in what is arguably Europe’s most advanced toll system, reports Jon Masters. Turkey has introduced a new system of technology for charging for use of its 2000km national highway network, heralded as the first full-scale use of passive RFID tags for electronic open road tolling in Europe. The new ‘Fast Passing System’ (HGS) is an upgrade of Turkey’s existing Automatic Passing System (OGS) technology, which uses
  • September 17, 2013
    Ohio Turnpike infrastructure project funds
    The Ohio Turnpike and Infrastructure Commission (OTIC) has approved the US$930 million funding needed for ten projects in northern Ohio, each within twenty miles of the turnpike. The 241 mile-long, limited-access toll highway serves as a primary corridor to Chicago and Pittsburgh.