Skip to main content

Kapsch TrafficCom to provide toll system the Louisville-Southern Indiana Ohio River Bridges

Kapsch TrafficCom North America has been awarded a US$41 million contract by the Indiana Finance Authority (IFA) to provide the toll system for the Louisville-Southern Indiana Ohio River Bridges (LSIORB). The comprehensive project includes the installation, integration, operation, and maintenance of an end-to-end open road toll collection system, as well as back office system and customer service centre operation at the three bridges that will connect Louisville, Kentucky and Jeffersonville, Indiana. As
May 14, 2015 Read time: 2 mins
4984 Kapsch TrafficCom North America has been awarded a US$41 million contract by the Indiana Finance Authority (IFA) to provide the toll system for the Louisville-Southern Indiana Ohio River Bridges (LSIORB).

The comprehensive project includes the installation, integration, operation, and maintenance of an end-to-end open road toll collection system, as well as back office system and customer service centre operation at the three bridges that will connect Louisville, Kentucky and Jeffersonville, Indiana. As a cooperative project between the two states, the initiative represents a joint commitment to improving the region’s transportation system by alleviating congestion, increasing safety and mobility, and stimulating economic development.

The LSIORB tolling system will enable the use of toll tags operating on the ISO 18000 6C protocol, as well as E-ZPass TDM protocol-based transponders, giving customers the option to purchase a toll tag for local use or for travel within an out-of-state toll network. Compatibility with these two systems makes the LSIORB project as an important milestone in tolling interoperability, as it facilitates mobility for motorists and for toll operators between regions by using shared technologies.

The initial project scope includes the addition of tolling infrastructure to the soon-to-be-completed New Downtown Bridge and the East End Bridge, as well as to the existing Kennedy Bridge, which will be temporarily closed and renovated to increase capacity across the Ohio River and improve mobility in the Louisville-Southern Indiana region. Kapsch will design the tolling equipment and software, provide customer account management systems, oversee transponder distribution, and maintain customer service operations and walk-in retail centres.

Kapsch will manage the project from its local office located in the Louisville-Southern Indiana area.  The bridges are set to open for tolling by the end of 2016.

Related Content

  • September 16, 2014
    Kapsch preliminary preferred vendor for Ohio bridge toll project
    The Kentucky-Indiana Joint Board has unanimously selected Kapsch TrafficCom as the preliminary preferred proposer in the competition to provide an electronic toll system for the bi-state Ohio River Bridges project. The board’s action followed independent staff reviews of technical and financial proposals submitted by the competing firms. Kapsch was one of six interested companies that the board in January deemed qualified to submit proposals for the toll system provider (TSP) contract. The Indiana Fin
  • April 17, 2015
    USDOT finances Ohio River Bridges East End Crossing
    US Transportation Secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$162 million from the Department's Federal Highway Administration to finance the East End Crossing section of the Louisville-Southern Indiana Ohio River Bridges Project. At the total cost of US$1.27 billion, the East End Crossing includes the East End Bridge and its connecting roadways. The bridge spans the Ohio River eight miles to the north connecting the east end of Louis
  • August 8, 2016
    Tolling cameras being installed on Ohio rivers project
    Tolling won’t begin until late this year, but drivers may soon notice cameras in place on the toll gantry located at the north end of the Abraham Lincoln Bridge, near Court Avenue, on the Ohio Rivers Project in the US. Two cameras are scheduled to be installed for testing as part of preparations for the new RiverLink all-electronic tolling system. Tolling won’t begin until cross-river capacity is added to the system. That means either the improved Kennedy Bridge will be fully open to six lanes of I-65
  • October 25, 2017
    ITC final ruling favours Kapsch TrafficCom over Neology IP claims
    Kapsch TrafficCom North America has announced that the U.S. International Trade Commission (ITC) has ruled in final form in favour of them in a legal motion brought by Neuology, Inc. The ruling of the full Commission is in response to Neology’s request for reconsideration of the ITC judge’s initial decision that Kapsch does not violate any patent assertions by importing electronic tolling products using the ISO/IEC 18000-6C communications protocol (6C Standard).