Skip to main content

FTA disappointed at Dartford free-flow toll delay

‘The delay of the introduction of free-flow tolls at Dartford River Crossing disappointing as it may present additional costs to industry’ is the message from the Freight Transport Association (FTA). The Association has voiced its concern in response to the announcement by the Highways Agency (HA) that the planned technology to allow motorists to use the crossing without having to stop at barriers and pay is to be delayed by up to four weeks. Originally planned to be in place by the 28 October 2014, th
September 22, 2014 Read time: 4 mins
‘The delay of the introduction of free-flow tolls at Dartford River Crossing disappointing as it may present additional costs to industry’ is the message from the 6983 Freight Transport Association (FTA).  The Association has voiced its concern in response to the announcement by the 503 Highways Agency (HA) that the planned technology to allow motorists to use the crossing without having to stop at barriers and pay is to be delayed by up to four weeks.
 
Originally planned to be in place by the 28 October 2014, the HA has now said that the system will now not be ready to use until late November.
 
Malcolm Bingham, FTA’s head of Road Network Management Policy said: “This is disappointing news that the free-flow tolling at Dartford is now to be delayed – the costs of this hold-up are unacceptable to the freight industry. FTA has been asking for a long time for this system to be introduced as this is the appropriate way forward in order to reduce a good deal of administration costs for the freight industry in dealing with tolls, charges and queues at the crossing.”
 
FTA has previously expressed support of the free-flow system, saying that ‘it would be good news for the freight industry’ within its response to the 1837 Department for Transport consultation on the proposals to revise the road charging regime.  On behalf of its members, the Association stated that freight operators have always maintained that the toll plazas themselves cause the majority of the congestion at the crossing.  According to FTA figures, at present it already costs an estimated £1 per minute per HGV in running costs to queue at the Dartford tolls.
 
The free-flow technology will allow motorists to use the crossing without having to stop at barriers to hand over payment, and instead they will be able to pay through a variety of methods including telephone, text message, online and at retail outlets, giving drivers greater flexibility in how and when they pay the charge.
 
Bingham added: “However, we need to be sure that the system will work, and it is therefore vital that they get it right.   FTA has and will continue to work with the Highways Agency to help get a resolution to this issue as soon as possible.”

According to the HA, the full benefits of the scheme will be delivered by the end of April 2015, when all changes to the road layout will be completed. The website, systems and infrastructure needed to operate these new arrangements have been installed and are currently being tested to ensure that they operate reliably and are easy to use.

The timetable will ensure that drivers have enough notice to prepare for the changes and that the system is fully tested before it is introduced.

Highways Agency project leader Nigel Gray said: “Dart Charge is a massive change for drivers using the Dartford Crossing and it’s only right that it is thoroughly tested before being introduced.

“We want to help drivers to be ready for the improvements we’re making at the Crossing. That’s why we are saying today that Dart Charge will start during late November.  We can reassure drivers that we’ll give them plenty of notice before the changes are introduced. They will have considerable time to sign up for a pre-pay account, which for most will be the easiest and cheapest way to pay the charge – with discounts of up to a third on every crossing.”

Until Dart Charge goes live, the current payment arrangements for the road user charge at the Crossing will continue - cash at the Crossing, through a DART-Tag or local residents account.

For more information on companies in this article

Related Content

  • HGVs without safety equipment to be banned from London
    February 6, 2015
    Britain’s first Safer Lorry Scheme, a London-wide ban on any lorry not fitted with safety equipment to protect cyclists and pedestrians, has been given the go ahead by the mayor, Transport for London (TfL) and London Councils. The scheme received 90 per cent support in a public consultation Traffic orders implementing the scheme are currently being published. Installation of road signs at the London boundary, training of police officers and information campaigns with drivers and hauliers have all started
  • Free-flow tolls for new £2bn Thames crossing
    November 16, 2020
    More than 27 million drivers annually may use the planned Lower Thames Crossing near London
  • FTA highlights work of logistics companies for vulnerable road user safety
    November 4, 2014
    As part of its Logistics for Cycling campaign, the Freight Transport Association (FTA) has today published Shared Vision, a document setting out examples of the work logistics companies are doing to improve safety on the roads for vulnerable road users – pedestrians, motorcyclists and especially cyclists. The FTA document provides a flavour of the wide range of initiatives that companies are implementing which they and the Association believe will result in improved safety on the roads. Action includes
  • Kapsch outlines tolling options to combat traffic congestion
    January 11, 2017
    Michael Maitland from Kapsch TrafficCom looks at how the various forms of tolling can help authorities combat traffic congestion and air quality problems while simultaneously raising revenue.