Skip to main content

FTA disappointed at Dartford free-flow toll delay

‘The delay of the introduction of free-flow tolls at Dartford River Crossing disappointing as it may present additional costs to industry’ is the message from the Freight Transport Association (FTA). The Association has voiced its concern in response to the announcement by the Highways Agency (HA) that the planned technology to allow motorists to use the crossing without having to stop at barriers and pay is to be delayed by up to four weeks. Originally planned to be in place by the 28 October 2014, th
September 22, 2014 Read time: 4 mins
‘The delay of the introduction of free-flow tolls at Dartford River Crossing disappointing as it may present additional costs to industry’ is the message from the 6983 Freight Transport Association (FTA).  The Association has voiced its concern in response to the announcement by the 503 Highways Agency (HA) that the planned technology to allow motorists to use the crossing without having to stop at barriers and pay is to be delayed by up to four weeks.
 
Originally planned to be in place by the 28 October 2014, the HA has now said that the system will now not be ready to use until late November.
 
Malcolm Bingham, FTA’s head of Road Network Management Policy said: “This is disappointing news that the free-flow tolling at Dartford is now to be delayed – the costs of this hold-up are unacceptable to the freight industry. FTA has been asking for a long time for this system to be introduced as this is the appropriate way forward in order to reduce a good deal of administration costs for the freight industry in dealing with tolls, charges and queues at the crossing.”
 
FTA has previously expressed support of the free-flow system, saying that ‘it would be good news for the freight industry’ within its response to the 1837 Department for Transport consultation on the proposals to revise the road charging regime.  On behalf of its members, the Association stated that freight operators have always maintained that the toll plazas themselves cause the majority of the congestion at the crossing.  According to FTA figures, at present it already costs an estimated £1 per minute per HGV in running costs to queue at the Dartford tolls.
 
The free-flow technology will allow motorists to use the crossing without having to stop at barriers to hand over payment, and instead they will be able to pay through a variety of methods including telephone, text message, online and at retail outlets, giving drivers greater flexibility in how and when they pay the charge.
 
Bingham added: “However, we need to be sure that the system will work, and it is therefore vital that they get it right.   FTA has and will continue to work with the Highways Agency to help get a resolution to this issue as soon as possible.”

According to the HA, the full benefits of the scheme will be delivered by the end of April 2015, when all changes to the road layout will be completed. The website, systems and infrastructure needed to operate these new arrangements have been installed and are currently being tested to ensure that they operate reliably and are easy to use.

The timetable will ensure that drivers have enough notice to prepare for the changes and that the system is fully tested before it is introduced.

Highways Agency project leader Nigel Gray said: “Dart Charge is a massive change for drivers using the Dartford Crossing and it’s only right that it is thoroughly tested before being introduced.

“We want to help drivers to be ready for the improvements we’re making at the Crossing. That’s why we are saying today that Dart Charge will start during late November.  We can reassure drivers that we’ll give them plenty of notice before the changes are introduced. They will have considerable time to sign up for a pre-pay account, which for most will be the easiest and cheapest way to pay the charge – with discounts of up to a third on every crossing.”

Until Dart Charge goes live, the current payment arrangements for the road user charge at the Crossing will continue - cash at the Crossing, through a DART-Tag or local residents account.

For more information on companies in this article

Related Content

  • UK's Hindhead tunnel pushes the boundaries of traffic management
    January 23, 2012
    The new Hindhead Tunnel is the first in the UK to use radar-based incident detection. Paul Arnold, project manager with the Highways Agency, talks about the project. The comparatively remote location of the A3 Hindhead Tunnel has resulted in it becoming one of the most sophisticated in the UK in terms of monitoring and control systems, according to Paul Arnold, project manager for the Highways Agency (HA), which manages strategic roads in England and Wales. It is the first tunnel in the UK to use radar for
  • Bill Halkias: 'We need a sustainable world'
    April 20, 2021
    In the first of our Tolling Matters interview series, Bill Halkias, MD & CEO of Attica Tollway Operations Authority and president of the International Road Federation, talks to Adam Hill about post-Covid recovery and sustainable mobility
  • IBTTA: industry must commit to trust and accountability
    August 23, 2018
    Without a commitment to trust and accountability, the modern road tolling industry would not have the bedrock which it requires – and which customers demand, says IBTTA’s Bill Cramer When Tim Stewart, executive director of Colorado’s E-470 Public Highway Authority, settled on ‘trust and accountability’ as the themes for his year as IBTTA president, it was a very deliberate choice. Stewart was looking for language that would help deliver the global tolling industry’s message of service excellence to cust
  • IBTTA’s Jones sees turbulent times and a bright future for tolling
    November 10, 2017
    Colin Sowman talks to IBTTA’s Pat Jones about the future of tolling in a fast-changing world. Pat Jones may have been executive director and CEO of the International Bridge, Tunnel and Turnpike Association (IBTTA) for 15 years but in his words: “Never before have I seen so much change coming so fast in the transportation and tolling industry.” Amidst all this change, tolling companies are asked to provide funding for roadway building or improvements which will be repaid for over, say, a 30-year concess