Skip to main content

Fitch: Smooth ride so far for US managed lanes

Managed lanes throughout the US are off to a good start in 2017, according to Fitch Ratings in its latest managed lanes peer review. Actual performance is so far exceeding Fitch’s rating case for the sector as a whole, with 95 Express in Northern Virginia and NTE (segments 1 and 2) in Texas proving to be notable examples. Also boosting long-term prospects for managed lanes is the performance on the longest operating facility, SR-91 in Orange County, California. This state road is seeing strong compound a
March 9, 2017 Read time: 2 mins
Managed lanes throughout the US are off to a good start in 2017, according to Fitch Ratings in its latest managed lanes peer review.

Actual performance is so far exceeding Fitch’s rating case for the sector as a whole, with 95 Express in Northern Virginia and NTE (segments 1 and 2) in Texas proving to be notable examples. Also boosting long-term prospects for managed lanes is the performance on the longest operating facility, SR-91 in Orange County, California. This state road is seeing strong compound annual growth rate (CAGR) post initial ramp-up despite numerous adverse developments.

According to Fitch, SR-91 did see moderate softening during the most recent recession coupled with multiple free capacity expansions. Long term revenue growth CAGR is six per cent despite volatility and expansion plus the roadway’s ‘land-bridge’ configuration has helped drive demand. Many of the projects will eventually link into managed lanes networks and it is still uncertain how performance will be impacted as such networks develop.

High occupancy vehicle (HOV) policy and other policies governing free access to managed lanes remains an essential component of Fitch’s analysis. Free access policies have their pros and cons, with policies for HOVs with two or more passengers (HOV2) proving to be problematic over time as non-tolled vehicles crowd out paying drivers. As such, some policies will need to change for all users to share both the costs and benefits of the managed lanes.

Taking these uncertainties into account, the Rating Outlooks for the vast majority of Fitch’s rated managed lanes is Stable. Fitch recently revised the Rating Outlook for 95 Express to Positive from Stable. Broadly speaking, however, Fitch does not envision rating changes in the near term with 10 out of 11 projects in various stages of construction or ramp up.

Related Content

  • November 26, 2015
    Transurban and VDOT announce two Express Lanes extensions
    Australia-based Transurban and the Virginia Department of Transportation have announced extensions to the I-95 and I-395 in Northern Virginia. The 395 Express Lanes project will convert the existing two I-395 high occupancy vehicle (HOV) lanes into three Express Lanes and extend the current dynamic tolling and traffic management system. It also involves an extension to the 95 Express Lanes for 11 kilometres north to the Washington DC border. Transurban has also announced an in-principle agreement VDOT
  • June 25, 2012
    Cofiroute USA installs management system for 91 Express Lanes
    Cofiroute USA, which introduced toll road automation on the 91 Express Lanes in Orange County, California, has installed a fully integrated back office system as part of a five year US$38.5 million contract awarded earlier this year. The system provides for transponder tracking, accounting, a web-based consumer interface and dynamic pricing capabilities. The company worked with its software partner TollPlus to meet the specific requirements of the Orange County Transportation Authority (OCTA). This include
  • August 8, 2012
    Construction begins on $1 billion I-95 Express Lanes in Northern Virginia
    Surrounded by elected officials, transportation engineers, and dignitaries, Virginia Governor Bob McDonnell held a groundbreaking ceremony yesterday to begin construction of the I-95 Express Lanes in Northern Virginia. The project will build 29 miles (46.7kms) of express lanes on I-95 from Garrisonville Road in Stafford County to Edsall Road in Fairfax County, and will connect the I-95 Express Lanes to the I-495 Express Lanes currently under construction to provide a seamless network of new lanes to reduce
  • September 20, 2013
    Funding agreed for reconstruction of Fort Worth I-35W
    A significant milestone in the redevelopment and expansion of Interstate 35W in Fort Worth, one of the most critical and most-congested corridors in the North Texas region and in the country has been achieved by NTE Mobility Partners Segments 3 LLC (NTEMP3). They have reached financial agreement on Segment 3A of the North Tarrant Express (NTE), paving the way for the reconstruction and expansion of the interstate. The project is being financed through a unique combination of public and private funds: US$