Skip to main content

First phase of Houston reversible HOV to HOT lanes completed

Houston’s Metropolitan Transit Authority of Harris County (Metro) working with prime contractor TransCore has commissioned the first of five reversible high occupancy toll (HOT) lane corridors. One of the most substantial undertakings of its kind to date in the United States, Metro’s conversion of high occupancy vehicle (HOV) lanes to HOT lanes will increase utilization of the HOV system and subsequently relieve congestion in the general purpose freeway lanes. When completed, the programme will span 135kms
June 19, 2012 Read time: 2 mins
Houston’s Metropolitan Transit Authority of Harris County (Metro) working with prime contractor 139 Transcore has commissioned the first of five reversible high occupancy toll (HOT) lane corridors. One of the most substantial undertakings of its kind to date in the United States, Metro’s conversion of high occupancy vehicle (HOV) lanes to HOT lanes will increase utilization of the HOV system and subsequently relieve congestion in the general purpose freeway lanes.

When completed, the programme will span 135kms throughout Houston, the fourth largest city in the United States and the largest city in Texas. The IH-45 South Gulf Freeway is the first corridor in Metro’s HOV network to undergo the transformation with construction of the remaining US 59 South, IH-45 North, US 290 and US 59 North corridors to be completed by the end of 2012.

The HOT lanes will now be reversed from the inbound to outbound direction using a new automated reversible gate operation (ARGO) system that was deployed as part of the conversion effort. The ARGO system is an industry first of-its-kind and size, allowing Metro to remotely monitor and efficiently control access and egress throughout the entire HOT network from the area’s multi-agency traffic management centre, 61 Houston Transtar.

In addition to serving as the prime contractor for the system design and installation of the HOT and ARGO systems, TransCore is also contracted to provide turnkey lane, roadway, and back office operation and maintenance services for the two systems over the next six years.

For more information on companies in this article

Related Content

  • Indra wins back office systems contract for three Texas highways
    June 22, 2012
    Tex Toll Services, a subsidiary of Cintra in the USA, which is in turn a branch of Ferrovial, has awarded Spain-headquartered Indra a US$14.9 million contract to implement electronic toll back office systems on the SH-130, LBJ Express and North Tarrant Express highways, in Texas. Besides the development, implementation and maintenance of the electronic toll systems back office on the three highways, the contract also includes the setting up of two high-availability data processing centres, one in Austin and
  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • California’s MTC expands Cubic Clipper card contract
    April 24, 2014
    California’s Metropolitan Transportation Commission (MTC) has awarded Cubic Transportation Systems a US$7.5 million add-on contract to expand the Clipper card fare payment system to more than a dozen suburban transit agencies in the San Francisco Bay Area. The system, which Cubic delivered and operates, will enhance travel options for commuters in parts of the East and North Bay. Under the updated contract, Cubic will install and configure Clipper fare collection equipment on all East Bay and North Bay o
  • NCDOT chooses PPP to improve I-77 traffic flow in Charlotte
    April 17, 2014
    North Carolina Department of Transportation’s (NCDOT) has announced the apparent successful bidder for its first public-private-partnership (P3) contract to improve the traffic flow along 26 miles of I-77 in the Charlotte area, one of the most congested roadways in the state. It includes the development of HOT lanes in both directions. Following a required bidding process and pending final review Cintra Infraestructures will construct the I-77 project through a joint venture with F.A. Southeast, W.C. En