Skip to main content

EU electronic toll service has fallen behind schedule

According to a recent report by the European Commission, EU member states are far behind schedule in implementation of the European Electronic Toll Service (EETS). It is already clear that the target date of 8 October 2012 for heavy duty vehicles will not be met. The system is designed to enable road users to pay tolls throughout the EU with one subscription contract, one service provider and one on-board unit. The aim is to eliminate cumbersome procedures for cross-border users. The legislation requires me
September 10, 2012 Read time: 2 mins
According to a recent report by the 1690 European Commission, EU member states are far behind schedule in implementation of the European Electronic Toll Service (EETS). It is already clear that the target date of 8 October 2012 for heavy duty vehicles will not be met.

The system is designed to enable road users to pay tolls throughout the EU with one subscription contract, one service provider and one on-board unit. The aim is to eliminate cumbersome procedures for cross-border users. The legislation requires member states to open their tolling systems to commercial EETS providers. EETS must be available to all vehicle categories by October 2014.

The report blames incomplete national transposition of the required rules in most member states. There has also been a delay in the necessary investment in both the systems and the resting required by toll chargers.

In response to the report, the Commission has published a warning that it will launch infringement proceedings against member states that fail to meet their obligations to roll out the service. But it also lays out possible assistance the Commission could offer to help speed up the roll-out, including financial assistance for interoperability projects between member states, under the trans-European transport programme.

For more information on companies in this article

Related Content

  • Parliamentary council urges UK gov to support EC safety proposals
    May 18, 2018
    A key UK safety body is calling for legislative action on European Commission vehicle safety proposals. The Parliamentary Advisory Council for Transport Safety (PACTS) wants the EC’s third mobility package to be adopted by the UK government. These measures are part of the Juncker Commission’s initiative to implement less polluting vehicles in Europe and provide more advanced technological solutions. This package outlines a new road safety policy framework for 2020-2030 and is accompanied by two legislativ
  • Workzone safety can be economically viable
    October 24, 2014
    David Crawford looks how workzone safety can be ‘economically viable’. Highway maintenance is one of the most dangerous construction industry occupations in Europe. Research from The Netherlands on fatal crashes indicates that the risk facing road workzone operatives is ‘significantly higher’ than that for the general construction workforce. A survey carried out by the Highways Agency, which runs the UK’s motorway and trunk road network, has suggested that 20% of road workers have suffered injuries from pa
  • High cost of French air pollution, report cites transportation
    August 5, 2015
    A report entitled Air pollution: the cost of inaction, published in July by the French Senate Committee of Enquiry estimates the annual cost of air pollution in France at €101.3 billion ($110 trillion), according to EurActiv France. The committee has described air pp0llution as an ‘economic aberration’ and has proposed measured including raising the tax on diesel and taxing emissions of the worst polluting substances. While overall air pollution has fallen in recent years, "the nature of the pollution
  • Effortless mobility for everyone
    September 10, 2021
    To improve the way we move people around, a lot of stakeholders are going to need to start cooperating and aligning, suggests Edwin van den Belt, software architect at Dat.mobility