Skip to main content

EU electronic toll service has fallen behind schedule

According to a recent report by the European Commission, EU member states are far behind schedule in implementation of the European Electronic Toll Service (EETS). It is already clear that the target date of 8 October 2012 for heavy duty vehicles will not be met. The system is designed to enable road users to pay tolls throughout the EU with one subscription contract, one service provider and one on-board unit. The aim is to eliminate cumbersome procedures for cross-border users. The legislation requires me
September 10, 2012 Read time: 2 mins
According to a recent report by the 1690 European Commission, EU member states are far behind schedule in implementation of the European Electronic Toll Service (EETS). It is already clear that the target date of 8 October 2012 for heavy duty vehicles will not be met.

The system is designed to enable road users to pay tolls throughout the EU with one subscription contract, one service provider and one on-board unit. The aim is to eliminate cumbersome procedures for cross-border users. The legislation requires member states to open their tolling systems to commercial EETS providers. EETS must be available to all vehicle categories by October 2014.

The report blames incomplete national transposition of the required rules in most member states. There has also been a delay in the necessary investment in both the systems and the resting required by toll chargers.

In response to the report, the Commission has published a warning that it will launch infringement proceedings against member states that fail to meet their obligations to roll out the service. But it also lays out possible assistance the Commission could offer to help speed up the roll-out, including financial assistance for interoperability projects between member states, under the trans-European transport programme.

For more information on companies in this article

Related Content

  • Dynamic Message Signs : Don’t replace, refurbish and upgrade
    August 12, 2015
    Refurbishing old dynamic message signs can save money and increase technical capabilities as David Crawford discovers. Evidence is growing on both sides of the Atlantic of the scope for retrofitting old or technically out-of-date dynamic message signs (DMS) with new electronic equipment, to save on the costs of installing full-scale replacements. In the last four months of 2014, a number of US states progressed programmes that achieved savings of more than US$1.75 million (€1.56million).
  • Maintaining momentum: learning lessons from the London Olympics
    November 15, 2013
    Japan will not only host this year’s ITS World Congress but has been selected for the 2020 Olympics. So what can Japan, and indeed Brazil, learn from the traffic management for London 2012 - Geoff Hadwick finds out. It was a key moment when Olympic boss Jacques Rogge signed off London 2012, calling the Games “happy and glorious.” Scarred by the logistical disaster of Atlanta 1996 and the last-minute building panic for Athens 2008, Rogge clearly thought London 2012 was an object lesson in how to plan and
  • Better websites build smarter transport participation
    March 17, 2017
    Transport initiatives are gaining traction through well-designed websites. Four European smart transport-oriented websites have gained honours in the 2016 .eu Web Awards, an online competition inaugurated in 2014 to recognise the most impressive sites within the .eu internet domain in terms of their design and content. The four were among 15 finalists across all five categories of the scheme, giving the transport sector a high profile for its proactive use of sites as communications tools for driving major
  • European truck industry gears up for platooning by 2023
    May 19, 2017
    Europe’s truck manufacturers have revealed a detailed timeline of steps leading up to the introduction of convoys of semi-automated trucks on Europe’s motorways before 2025, with the publication of the European Automobile Manufacturers’ Association (ACEA) report EU Roadmap for Truck Platooning. This also provides guidance to policy makers and authorities on the regulatory changes and political support necessary for cross-border truck platooning. Truck platooning is the linking of two or more trucks in convo