Skip to main content

ITS from Indra helps Colombia tunnels

Tolling and communications are also major part of new Latin American infrastructure project
By Adam Hill October 31, 2022 Read time: 2 mins
Indra is instrumental in Bogotá-Villavicencio corridor final section in Colombia (image: Indra)

Indra has provided ITS for a massive road and tunnel project in Colombia.

Consorcio Vial Andino (Conandino), builder of the new freeway between Chirajara and Fundadores, awarded the project to the Indra-Comsa consortium for €20 million. 

Indra has equipped  the new tunnels and open-air roads of the Bogotá-Villavicencio corridor final section in Colombia with its Mova Traffic solution.

The company has renovated the Buenavista control centre, installing its Horus traffic and tunnel management platform, part of Indra Mova Traffic, to control the new section and its six tunnels, including the 4.5km-long Buenavista, one of the longest tunnels in Latin America.

As well as ITS, the consortium will also implement communications systems (Mova Comms), safety systems (Mova Protect), CCTV, traffic counters, road signs, emergency call boxes, fire detection, lightning control and PA systems, among others.

Indra has also upgraded and expanded the existing toll stations (Boquerón, Naranjal and Pipiral), implementing the Mova Collect toll system in a bid to reduce congestion at these points.

The Buenavista control centre, together with the main control centre in Boquerón and the one in Naranjal, also allow centralised monitoring and control of the entire concession with a single interface.

Indra's Horus platform already handles the management of the 27 tunnels that are part of the Bogotá-Villavicencio dual carriageway, a highway with more than 12,000 vehicles per day. The new section will reduce travel time along this corridor, used mainly by the tourism and freight sectors, by an additional 22 minutes.

"It is a good opportunity to showcase our advanced technology and Indra's ability to carry out the most ambitious and complex projects. But the true value of technology is to contribute to economic and social development and improve people's lives. In this case, we are sure that the freeway and its advanced solutions will do that," said Manuel López Villena, Director of Traffic and Infrastructures in Indra's Mobility market.

For more information on companies in this article

Related Content

  • Indra wins big in Mexico
    December 20, 2013
    Spanish technology multinational Indra has been awarded four new contracts worth US$17 million for its traffic control and toll technology in Mexico. The technology will be implemented on the Paquete Michoacán motorways, the Poetas fast lane, the Celaya ring road motorway and the Necaxa Tihuatlan tunnels. Intelligent traffic systems (ITS) and toll systems will be deployed on the Celaya ring road motorway, including a control centre to integrate the various ITS and surveillance sub-systems via closed circ
  • Sice systems future proof Fehmarnbelt Tunnel
    April 4, 2023
    Picking up the electro-mechanical contract for the Fehmarnbelt Tunnel was a milestone, according to David Calero Monteagudo, head of global ITS and tunnel business for Spanish company Sice. David Arminas finds out more
  • Efkon wins six new ITS contracts in India
    May 23, 2012
    Austrian company Efkon has announced that its Efkon India subsidiary has won six prestigious ITS projects, worth a total of US$12.65 million, in the last five months. The Jaypee Group has awarded the company a follow-up contract for a turnkey solution for the expressway traffic management and speed enforcement systems for the Yamuna expressway in the south of New Delhi. Efkon is providing a single interface solution for all the sub-systems which enables information capture of all expressway activities and c
  • Indra wins contract by Highways England for tunnel management technology
    October 25, 2017
    Indra has been awarded a contract from Highways England (HE) to install a Tunnel Management Control System (TMCS) for its tunnel estate as part of a project that foresees the option of implementing the solution in all 13 tunnels managed by HE for €10 million (£8,900,00).