Skip to main content

Indra brings ITS to Philippines bridge

Technology includes Horus integrated traffic and infrastructure management platform
By Adam Hill June 16, 2022 Read time: 2 mins
Daily traffic on CCLEX is estimated to reach 50,000 vehicles

Indra has installed ITS technology on the Philippines' longest and highest bridge.

Built on concrete piles that rise from the seabed, the recently-opened 8.9km toll road - the Cebu-Cordova Link Expressway (CCLEX) - connects Cebu City to the Municipality of Cordova in Mactan Island.

Run by the Cebu Cordova Link Expressway Corporation (CCLEC), daily traffic is estimated to reach 50,000 vehicles. 

Indra installed its Horus integrated traffic and infrastructure management platform and ITS from its Mova Traffic portfolio on the expressway. 

This allows real-time monitoring and control of all traffic and safety systems incorporated in the infrastructure for traffic management, with a single interface that facilitates operation and decision-making.

Indra says: "The highly-automated system helps to reduce the risk of incidents, automatically detects incidents when they do occur and streamlines incident management."

Static and dynamic weighing systems installed on the bridge mean Indra's solution can restrict overloaded vehicles.

Technology includes CCTV cameras, intelligent incident detection video surveillance, automatic licence plate recognition with speed detection, variable message signs, and emergency telephone posts.

“This project is a clear example of sustainable development where new infrastructure coupled with Indra's technology, besides producing greater safety for drivers, will boost the economies of Cebu and Cordova by making it easier to travel between them and to Mactan international airport," says Berta Barrero, MD of Indra's Mobility market. 

"The reduction in travel times – by reducing CO2 emissions – will also help to improve environmental quality in the region."

Indra is the technology partner of Metro Pacific Tollways Corporation, parent firm of CCLEC, and is also the Philippines' largest toll road concessionaire and operator.

Its highway projects include the Manila urban traffic control centre, and toll systems on various roads including the Metro Manila access highway and North Luzon Expressway.

Related Content

  • July 20, 2022
    Transurban identifies Indra HOV tech
    System will be used on the I-95, I-495, and I-395 express lanes in northern Virginia
  • September 2, 2015
    Indra to upgrade Algeria’s Bouïra tunnel
    The National Road Agency of Algeria (ANA) has awarded a contract for the modernisation of the Bouïra tunnel to a consortium comprising of the state construction company Cosider TP and Indra. The contract, which is worth US$12.3 million to Indra, will run for 15 months. It will deliver an integrated management solution and intelligent traffic systems for the tunnel, which is located on the east-west highway and crosses the country from the border with Tunisia to the border with Morocco and sees the heavi
  • October 3, 2013
    Philippines Skyway 3 project to start by end 2013
    The Philippines’ government has recently approved a US$612 million contract for the Metro Manila Skyway (MMS) Stage 3 Project which will connect the Southern Luzon Expressway to the Northern Luzon Expressway. The flood free, mostly elevated six lane expressway, is approximately 14.2 kilometres long and is expected to reduce congestion and reduce travel times on major roads in Manila.
  • November 30, 2015
    Indra wins in India with two transport and traffic contracts
    Indra has increased its penetration of the Indian transport and traffic by winning two contracts with a total value of US$12.5 million to deploy its technology in the longest tunnel in Southeast Asia, between Chenani and Nashri, and in the Navi Mumbai metro system, in India's financial capital, both currently under construction. Under the first contract, Indra is responsible for the design, supply, set-up and rollout of the control system for the 9.2 km long tunnel and will equip the control center with