Skip to main content

Philippines Skyway 3 project to start by end 2013

The Philippines’ government has recently approved a US$612 million contract for the Metro Manila Skyway (MMS) Stage 3 Project which will connect the Southern Luzon Expressway to the Northern Luzon Expressway. The flood free, mostly elevated six lane expressway, is approximately 14.2 kilometres long and is expected to reduce congestion and reduce travel times on major roads in Manila.
October 3, 2013 Read time: 1 min
The Philippines’ government has recently approved a US$612 million contract for the Metro Manila Skyway (MMS) Stage 3 Project which will connect the Southern Luzon Expressway to the Northern Luzon Expressway.

The flood free, mostly elevated six lane expressway, is approximately 14.2 kilometres long and is expected to reduce congestion and reduce travel times on major roads in Manila.

The project will commence before the end of the year and will be fully funded by the Citra Central Expressway Corporation and will be overseen by the Department of Transportation and Communications and the Toll Regulatory Board (TRB).

Related Content

  • November 4, 2015
    Indra to upgrade Philippines toll system
    Manila North Tollways Corporation (MNTC) has awarded Indra the design, supply, installation, and commissioning of the new toll control solution for its Subic-Clark-Tarlac Expressway (SCTEX) concession. The project includes the integration of the SCTEX toll control solution with that of the system that Indra recently implemented for the North Luzon Expressway (NLEX), the main motorway connecting the capital region of Metro Manila to the northern regions of the country. The contract, awarded in a consortium w
  • July 19, 2023
    NLEX adds more cameras and VMS to Philippines toll roadways
    Company operates three expressways: NLEX, SCTEX and NLEX Connector
  • April 8, 2013
    Indra wins Manila urban traffic control and toll lanes projects
    In two contracts totalling US$13.5 million, Spanish consulting and technology provider Indra is to equip Metro Manila, the Philippines’ main metropolitan region, with more than 11 million residents, with its urban traffic control system. The company will also upgrade the toll collection system for the 90 kilometre long Manila North Luzon Expressway (NLEX), one of the most important motorways in the Philippines, carrying more than 160,000 vehicles each day. For the urban traffic control project, in a consort
  • June 16, 2022
    Indra brings ITS to Philippines bridge
    Technology includes Horus integrated traffic and infrastructure management platform