Skip to main content

Xperience 10G with EtherWAN's EX78900X Series

Xperience greater bandwidth and faster speeds with EtherWAN's EX78900X Series. As devices on the edge become more data-intensive, more bandwidth is needed. It’s time to move to 10G! Make the switch before your network becomes obsolete
April 1, 2021

The EX78934X is a hardened, managed PoE switch, built to support the latest IEEE 802.3bt PoE protocol. Next generation PoE and ultra-fast speeds allow for a wide range of devices to be powered and connected to the network. This powerhouse duo of 12 PoE ports, each providing up to 90W power to compatible devices, along with (4) 10-gigabit uplink ports, is completely unseen in the market and will revolutionize your network.

For more information on companies in this article

Related Content

  • Vaisala takes special measures with Indigo
    May 25, 2020
    Vaisala's Indigo 520 Transmitter will be available from June
  • Econolite introduces bicycle differentiation software upgrade
    April 22, 2015
    Econolite has introduced its Autoscope software release Version 10.5.0 with Cyclescope, the latest free Autoscope software upgrade that provides enhanced bicycle differentiation accuracy. Cyclescope is compatible with all existing Autoscope Solo Terra, RackVision Terra, Encore, and Duo detection systems. Cyclescope enables bicycle-differentiated detection in support of bicycle minimum green signal programming, a green signal interval length to accommodate and help ensure that bicycles can safely cross an
  • £5m to ensure drones fly at Altitude
    January 13, 2023
    Telecoms giant BT invests in software and infrastructure provider Altitude Angels
  • Netherlands to get nationwide network of EV fast-charging stations
    July 8, 2013
    By 2015, electric vehicle (EV) drivers in the Netherlands will never be more than 50 kilometres from a fast charging station. Power and automation technology company ABB has been selected by Fastned to supply chargers to more than 200 electric vehicle fast-charging stations in the Netherlands. Each of the more than 200 Fastned stations will be located a maximum of 50 kilometres apart along all Dutch highways. The stations will be equipped with several multi-standards fast chargers, such as the 50 kW Terra