Skip to main content

Xperience 10G with EtherWAN's EX78900X Series

Xperience greater bandwidth and faster speeds with EtherWAN's EX78900X Series. As devices on the edge become more data-intensive, more bandwidth is needed. It’s time to move to 10G! Make the switch before your network becomes obsolete
April 1, 2021

The EX78934X is a hardened, managed PoE switch, built to support the latest IEEE 802.3bt PoE protocol. Next generation PoE and ultra-fast speeds allow for a wide range of devices to be powered and connected to the network. This powerhouse duo of 12 PoE ports, each providing up to 90W power to compatible devices, along with (4) 10-gigabit uplink ports, is completely unseen in the market and will revolutionize your network.

For more information on companies in this article

Related Content

  • Keeping cyber criminals from your website
    November 10, 2017
    If a hacker can penetrate your website, they can do business as you. Joe Dysart explains how you and your customers may not discover the fraud for some time. In the latest twist on identity theft, hackers are clandestinely taking over business websites - and then brazenly billing visiting customers as if the sites are their own.
  • Power products from Alpha Technologies
    July 25, 2012
    Alpha Technologies has introduced five new products to expand and update its line of ruggedised, outdoor Uninterruptible Power Supply (UPS) and backup power solutions. Included in this market introduction are three new battery backup system enclosures and two new transfer switches for use in traffic and ITS applications.
  • Power products from Alpha Technologies
    July 26, 2012
    Alpha Technologies has introduced five new products to expand and update its line of ruggedised, outdoor Uninterruptible Power Supply (UPS) and backup power solutions. Included in this market introduction are three new battery backup system enclosures and two new transfer switches for use in traffic and ITS applications.
  • Report: Priority funding for rail projects drives investments in Turkey
    January 22, 2015
    Turkish railways have undergone a complete overhaul due to significant investments over the last five years. In the majority of rail projects currently under way, investment is directed towards the construction of new high-speed rail (HSR) lines, electrification, extensions and upgrading of existing infrastructure. With u$18 billion allocated for the rail sector as part of the Turkey Vision 2023 plan, the country is expected to have a total conventional rail network length of 25,940 kilometres and a HSR net