Impact Recovery Systems has announced the Tuff Curb XLP, a low-profile high-performance kerbing system designed to withstand damaging high-speed, high-impact applications. Made from solid-coloured, UV-resistant, high-density polyethylene it is designed to withstand 20,000lb of static pressure, double the federal single axle vehicle maximum for a single wheel. In addition, Tuff Curb XLP has been tested by The Texas Transportation Institute to 2009 MASH standards.
Siemens’ new energy saving LED pedestrian crossing wait indicator retrofit solution allows both Siemens and Peek 48 volt incandescent wait indicators to be upgraded to the latest Central Light Source (CLS) LED technology, says the company. Siemens claim the low power consumption the solution offers power savings typically in excess of 70% and represents a highly cost effective upgrade option for existing wait indicators, particularly when undertaken alongside a wider LED traffic signal upgrade program. The
The Siemens stand at Intertraffic is always much more than a place where products and systems are displayed. This year is no exception. Think of Stand 209 in Hall 11 as a knowledge centre, a smart learning place, a time machine that opens up views into the future and much more.