Skip to main content

'Honk more, wait more' in Mumbai

Related Content

  • March 1, 2013
    DriveWyze wireless Preclear system speeds weighstation waiting
    Drivewyze aims to revolutionise the way weighstation bypass systems work with its Pre-Clear system. And it’s not just looking at weighstations, either… Pete Goldin reports. Truck drivers know the drill: pull off the high­way at every weighstation and wait. Carriers know the drill, too: every minute spent waiting there translates directly into dollars lost. Traditionally, the only alternative to this scenario is a transponder-based system, which allows trucks to bypass the sites using technology similar to
  • February 28, 2014
    Temporary traffic signal and integrated waiting time display
    The Solar Tempo Traffic Light, which TTS says is the only temporary traffic light to integrate a waiting time display, is visible up to 40 metres. The time display reduces impatient behaviour on the road. Flexible and easy to use, Tempo Traffic Light offers the ability to manage junctions for all road configurations, and uses renewable energy with its solar panel and charge regulator.
  • January 7, 2013
    Low power retrofit LED wait indicators from Siemens
    Siemens’ new energy saving LED pedestrian crossing wait indicator retrofit solution allows both Siemens and Peek 48 volt incandescent wait indicators to be upgraded to the latest Central Light Source (CLS) LED technology, says the company. Siemens claim the low power consumption the solution offers power savings typically in excess of 70% and represents a highly cost effective upgrade option for existing wait indicators, particularly when undertaken alongside a wider LED traffic signal upgrade program. The
  • April 12, 2018
    Louis Berger awarded Mumbai Metro Line four contract
    The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%. Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central