Skip to main content

Verkehrs-Systeme unveils VS-Plus enhancements

Verkehrs-Systeme will use Intertraffic Amsterdam to unveil new enhancements to its highly successful VS-Plus, the fully traffic actuated control software specially designed for implementing public transport priority while keeping coordination with other intersections.
April 4, 2016 Read time: 2 mins

8322 Verkehrs-Systeme will use Intertraffic Amsterdam to unveil new enhancements to its highly successful VS-Plus, the fully traffic actuated control software specially designed for implementing public transport priority while keeping coordination with other intersections.

VS-Plus is now available in its version 8 and offers the new ‘open VS-Plus’ module that lets the customer write their own true code snippets, being interpreted at run time. No compilation is needed, full OCIT compliance is guaranteed and no downtime of the intersection is required for program changes.

VS-Plus 8 has now integrated the former research "VS-Plus Net" module that can receive high-level network control commands, and recalculates online signal frames and other relevant parameters to enable network control and generally UTC with distributed intelligence while being capable of handling PT priority in the way VS-Plus is famous for.

Another major enhancement is that VS-Plus 8 is ready for I2V by incorporating a generic phase change prediction data stream and enabling parameter setting for better predictability by offering custom-tailored adaptivity restrictions. VS-PLUS 8 is also ready for V2I by being able to treat map matched GPS positions with usual GPS tolerance of about 15 metres.

Last but not least, VS-PLUS 8 can be used in its emulated PC version together with micro simulators in mesoscopic simulation mode by offering special mesoscopic traffic actuation parameters, if needed.

For more information on companies in this article

Related Content

  • Econolite’s Centracs software has priority
    June 5, 2019
    Econolite is using the Annual Meeting for the official unveiling of the company’s two breakthrough software solutions for traffic management, fire and emergency services, as well as transit operations. Centracs Edaptive is Econolite’s next-generation adaptive signal control, optimising cycle, offset, and splits by using high-fidelity 1/10-second resolution data. It’s built upon Econolite’s Centracs SPM and offers deep analytical capabilities, ensuring users can maximise the performance of their signal co
  • Dubai metro - the world's longest automated rail system
    July 31, 2012
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.
  • Integration of travel payment and information closer to reality
    January 7, 2013
    Integration of travel payment and information is bringing utopia in management of transportation as a single intermodal system is closer to reality. Larry Yermack writes. For decades, transportation planners and ITS visionaries all believed that transportation would not be fully optimised until it could be managed as a single intermodal system. Relationships between modal operators left this more in the dream category than reality. However, the steady march of advances in payment technology have brought us
  • Predicting the future for video camera systems
    March 12, 2012
    Jo Versavel, Managing Director of Traficon, talks about near-term trends in video camera systems. Jo Versavel starts by making one thing clear: long-term forecasts as to what the future holds for video-based traffic monitoring are to all intents and purposes meaningless. The state of the art is developing so fast that in reality it's impossible to say where we'll be in 10 years' time, says the Managing Director of Traficon. In his opinion making firm predictions even five years out is too ambitious, whereas