Skip to main content

Two major projects wins for Adaptive Display Solutions

Adaptive Display Solutions has been awarded two major projects in Atlanta, Georgia, with Brooks Berry Haynie & Associates. Together, the projects represent the largest delivery of full-colored dynamic message signs in the State of Georgia. The first project is “I-75/I-575 Managed Lanes in Cobb & Cherokee South”. Adaptive has started shipping its first installment of 65 full-colored Dynamic Message Signs (DMS), ranging from small five-character toll lane pricing indicator units all the way up to Georgia’s
June 3, 2015 Read time: 2 mins
Dennis Thums (left) and Jessie Swinea of Adaptive Display Solutions
5877 Adaptive Display Solutions has been awarded two major projects in Atlanta, Georgia, with Brooks Berry Haynie & Associates. Together, the projects represent the largest delivery of full-colored dynamic message signs in the State of Georgia. The first project is “I-75/I-575 Managed Lanes in Cobb & Cherokee South”.

Adaptive has started shipping its first installment of 65 full-colored Dynamic Message Signs (DMS), ranging from small five-character toll lane pricing indicator units all the way up to Georgia’s first 96 rows x 400 columns walk-in 20mm pitch DMS.

On the “I-75 @ 1 LOC & I-675 @ 1 LOC – Managed Lanes North” project, adaptive will begin delivering 115 full colored dynamic message signs in early 2016, including toll rate signs, travel time signs and large walk-in signs.

Adaptive signs offer 20/20 clarity and readability with built in Glare-Shield and AutoShine technologies. Glare- Shield dissipates sunlight and reduces glare while AutoShine auto-adjusts ambient light levels for maximum clarity.

Adaptive A-Series displays are both UL and cUL Listed and have recently been UL Energy Verified.

For more information on companies in this article

Related Content

  • Funding shortfall for US Interstate upgrades
    May 11, 2012
    Andrew Bardin Williams investigates tolling on the federal Interstate system as maintenance and upgrade requirements increasingly outpace funding The I-95 corridor through North Carolina is one of the most heavy trafficked interstates in the US, seeing upwards of 46,000 vehicles per day in some stretches-and North Carolina’s Department of Transportation (NCDOT) estimates this number will to rise to 98,000 vehicles per day by 2040. Along with the rest of the federal interstate system, the North Carolina str
  • Mario Cuomo Bridge: an ITS hotbed
    January 4, 2021
    The 3.1-mile Governor Mario M. Cuomo Bridge over the Hudson River in New York State is not just a massive engineering project – it is an ITS hotbed too. Phil Riggio of HDR tells Adam Hill why
  • IRD's on-the-go tyre check adjusts for inflation
    November 16, 2021
    As many as 84 million vehicles worldwide may have tyres which are improperly inflated or in poor condition, which has a significant effect on road safety - and also on the environment
  • Close shave for Brazilian project
    June 12, 2015
    Signing the order to equip a new control room just 45 days before the city hosts a major sporting event is challenging - but some deadlines just cannot be moved. There is nothing like a deadline to concentrate minds and effort as Mitsubishi and the Brazilian city of Belo Horizonte discovered in the run-up to the 2014 World Cup. Although municipal authorities had been considering a new command centre for years, it was the hosting of the World Cup last summer that provided the final impetus.