Skip to main content

Siemens introduces fast EV charging

At the recent Greenfleet Scotland exhibition Siemens UK took showcases its new electric vehicle (EV) charging solutions range which includes both modular DC and AC variants for all charging standards, including CHAdeMO and CSC COMBO 2. For slow or fast charging, the floor standing, pole or wall mounted AC charger (single or dual outlets) provides single phase charging output of 3.6kW or up to 22kW with three phase. Combining AC and/or DC fast charging, both modular DC 20kW and DC 45kW chargers provide c
June 6, 2014 Read time: 1 min
Siemens triple outlet fast charger
At the recent Greenfleet Scotland exhibition 189 Siemens UK its new electric vehicle (EV) charging solutions range which includes both modular DC and AC variants for all charging standards, including CHAdeMO and CSC COMBO 2.

For slow or fast charging, the floor standing, pole- or wall-mounted AC charger (single or dual outlets) provides single phase charging output of 3.6kW or up to 22kW with three phase. Combining AC and/or DC fast charging, both modular DC 20kW and DC 45kW chargers provide charging times of just 20 and 40 minutes depending on EV type.

For more information on companies in this article

Related Content

  • Siemens unveils EV charging structure 
    March 7, 2022
    Modular system at Peachtree Corners was created to electrify new or existing car parks
  • Evolt wins first Go Ultra Low City contract in Scotland
    November 16, 2016
    Swarco Group’s Evolt eMobility brand has been awarded a contract estimated at US$2.2 million (£1.8 million) by Dundee City Council for the first phase of works to support three new charging ‘hubs’ in the city, along with an additional regional charging infrastructure. As one of the Go Ultra Low Cities, Dundee is creating three new charging hubs that will become dedicated areas for the charging of electric vehicles. Each hub will be equipped with Evolt’s well proven charging technology, including a combi
  • Gridserve EV forecourt coming to Gatwick 
    December 13, 2021
    Each hub can add up to 100 miles of range in less than 10 minutes, firm says 
  • Charging station infrastructure boost to electric vehicle use
    July 17, 2012
    The first section of a planned network of stations for charging electric vehicles – the West Coast Electric Highway – opened in March, promising a welcome boost to the environment and economy of Oregon. Pete Goldin reports What should come first, the electric vehicle or the charging station? This dilemma has been hindering proliferation of ‘EVs’ in the US for years. Without a widespread and reliable infrastructure of charging stations, the American public is not likely to adopt EVs en masse. This may all b